Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
639
matching recommendationsNAICS | 3273 | Cement and Concrete Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0676 # 08 Y:2024 | 08 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $49 | $140 | n/a |
WV0676 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,979 | $653 | n/a |
WV0676 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $2,075 | $3,893 | n/a |
WV0676 # 02 Y:2024 | 02 | 2024 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $4,780 | $5,200 | n/a |
WV0676 # 01 Y:2024 | 01 | 2024 | INSULATE BARE EQUIPMENT | $64,709 | $86,472 | n/a |
WV0676 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,750 | $6,504 | n/a |
WV0676 # 04 Y:2024 | 04 | 2024 | DEVELOP A REPAIR/REPLACE POLICY | $3,482 | $1,197 | n/a |
WV0676 # 07 Y:2024 | 07 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $329 | $1,415 | n/a |
UL2411 # 02 Y:2024 | 02 | 2024 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $746 | $2,700 | n/a |
UL2411 # 06 Y:2024 | 06 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $35,308 | $50,000 | n/a |
UL2411 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $76,606 | $698,579 | n/a |
UL2411 # 04 Y:2024 | 04 | 2024 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $4,053 | $13,653 | n/a |
UL2411 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,717 | $1,995 | n/a |
UL2411 # 05 Y:2024 | 05 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,372 | $5,000 | n/a |
LE0570 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $9,292 | $0 | n/a |
LE0570 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $33,515 | $15,000 | n/a |
LE0570 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,252 | $5,000 | n/a |
LE0570 # 03 Y:2024 | 03 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $55,246 | $42,000 | n/a |
LE0570 # 06 Y:2024 | 06 | 2024 | INSTALL BACK-UP EQUIPMENT | $46,731 | $90,000 | n/a |
LE0570 # 04 Y:2024 | 04 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $25,168 | $26,500 | n/a |
AS0571 # 07 Y:2024 | 07 | 2024 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $430 | $987 | Not Implemented |
AS0571 # 06 Y:2024 | 06 | 2024 | USE POWER DURING OFF-PEAK PERIODS | $492 | $511 | Implemented |
AS0571 # 05 Y:2024 | 05 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,292 | $908 | Implemented |
AS0571 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,525 | $34,427 | Implemented |
AS0571 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $81,526 | $55,952 | Implemented |