IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

205

matching recommendations
Reset
NAICS 327390 Other Concrete Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2411 # 06 Y:2024 06 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $35,308 $50,000 n/a
UL2411 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $746 $2,700 n/a
UL2411 # 04 Y:2024 04 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $4,053 $13,653 n/a
UL2411 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,717 $1,995 n/a
UL2411 # 05 Y:2024 05 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,372 $5,000 n/a
UL2411 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $76,606 $698,579 n/a
UW2404 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $34,140 $25,000 n/a
UW2404 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $141,402 $150,381 n/a
UW2404 # 03 Y:2024 03 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $114,442 $742,868 n/a
UW2404 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $28,693 $75,000 n/a
UW2404 # 05 Y:2024 05 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,990 $112,500 n/a
CM1022 # 07 Y:2023 07 2023 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,174 $8,000 Not Implemented
CM1022 # 06 Y:2023 06 2023 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,118 $1,776 Not Implemented
CM1022 # 05 Y:2023 05 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $1,995 $2,168 Not Implemented
CM1022 # 04 Y:2023 04 2023 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $4,255 $4,988 Not Implemented
CM1022 # 03 Y:2023 03 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,609 $32,760 Not Implemented
CM1022 # 02 Y:2023 02 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,106 $92,608 Implemented
CM1022 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $10,354 $115,732 Not Implemented
SJ0004 # 04 Y:2023 04 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,799 $3,878 Implemented
SJ0004 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $163 $0 Not Implemented
SJ0004 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $18,246 $90,267 Implemented
SJ0004 # 03 Y:2023 03 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $96 $171 Not Implemented
SJ0004 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,544 $238 Implemented
AS0535 # 01 Y:2022 01 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,534 $44,427 Implemented
AS0535 # 04 Y:2022 04 2022 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $539 $156 Implemented