Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
149
matching recommendationsNAICS | 32742 | Gypsum Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
DL0234 # 01 Y:2024 | 01 | 2024 | ISOLATE HOT OR COLD EQUIPMENT | $36,400 | $82,500 | Not Implemented |
DL0234 # 02 Y:2024 | 02 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $21,550 | $30,000 | Not Implemented |
DL0234 # 03 Y:2024 | 03 | 2024 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $95,717 | $35,600 | Not Implemented |
DL0234 # 04 Y:2024 | 04 | 2024 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $76,734 | $166,100 | Not Implemented |
DL0231 # 04 Y:2024 | 04 | 2024 | INSULATE BARE EQUIPMENT | $25,112 | $9,768 | Not Implemented |
DL0231 # 07 Y:2024 | 07 | 2024 | IMPROVE COMBUSTION CONTROL CAPABILITY | $211,766 | $21,800 | Not Implemented |
DL0231 # 06 Y:2024 | 06 | 2024 | MAINTAIN MACHINES TO REDUCE LEAKS | $441,845 | $39,600 | Not Implemented |
DL0231 # 05 Y:2024 | 05 | 2024 | MAINTAIN MACHINES TO REDUCE LEAKS | $132,876 | $34,600 | Not Implemented |
DL0231 # 03 Y:2024 | 03 | 2024 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $149,450 | $333,800 | Not Implemented |
DL0231 # 08 Y:2024 | 08 | 2024 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $266,000 | $385,800 | Not Implemented |
DL0231 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $172,461 | $34,600 | Not Implemented |
DL0231 # 02 Y:2024 | 02 | 2024 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $229,694 | $2,880,000 | Not Implemented |
UF0601 # 04 Y:2023 | 04 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $32,141 | $49,680 | Implemented |
UF0601 # 03 Y:2023 | 03 | 2023 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $280,640 | $30,000 | Implemented |
UF0601 # 08 Y:2023 | 08 | 2023 | IMPROVE SPACE COMFORT CONDITIONING | $34,014 | $3,179 | Implemented |
UF0601 # 06 Y:2023 | 06 | 2023 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $74,558 | $0 | Implemented |
UF0601 # 07 Y:2023 | 07 | 2023 | LEVEL THREE - INSTALL OR MODIFY CONTROL SYSTEM WITH COMMUNICATION AND NONLOCAL EXTERNAL INFORMATION (I.E. WEATHER FORECA | $61,813 | $29,295 | Implemented |
UF0601 # 05 Y:2023 | 05 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $12,983 | $0 | Implemented |
UF0601 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,202,647 | $3,920,000 | Implemented |
UF0601 # 01 Y:2023 | 01 | 2023 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,858,540 | $0 | Not Implemented |
NT0012 # 06 Y:2023 | 06 | 2023 | REDUCE SCRAP PRODUCTION | $80,000 | $20,000 | Not Implemented |
NT0012 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $335 | $0 | Not Implemented |
NT0012 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,463 | $4,553 | Not Implemented |
NT0012 # 02 Y:2023 | 02 | 2023 | OPTIMIZE PLANT POWER FACTOR | $4,568 | $1,441 | Not Implemented |
NT0012 # 03 Y:2023 | 03 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $315 | $200 | Not Implemented |