Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

333

matching recommendations
Reset
NAICS 32799 All Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0116 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $46 $0 Implemented
CW0116 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $752 $70 Implemented
CW0116 # 05 Y:2020 05 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,030 $19,360 Not Implemented
CW0116 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $342 $1,350 Not Implemented
CW0116 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $138 $90 Implemented
CW0116 # 06 Y:2020 06 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,657 $2,615 Not Implemented
CW0116 # 07 Y:2020 07 2020 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $438 $0 Implemented
WV0594 # 09 Y:2020 09 2020 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,851 $1,500 Implemented
WV0594 # 03 Y:2020 03 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $54,583 $3,500 Implemented
WV0594 # 02 Y:2020 02 2020 USE STEAM PRESSURE REDUCTION TO GENERATE POWER $94,912 $539,790 Not Implemented
WV0594 # 04 Y:2020 04 2020 UPGRADE CONTROLS ON COMPRESSORS $46,633 $20,450 Implemented
WV0594 # 05 Y:2020 05 2020 INSULATE BARE EQUIPMENT $18,093 $41,800 Implemented
WV0594 # 01 Y:2020 01 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $126,819 $150,000 Not Implemented
WV0594 # 11 Y:2020 11 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $703 $896 Implemented
WV0594 # 10 Y:2020 10 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,131 $0 Not Implemented
WV0594 # 06 Y:2020 06 2020 DEVELOP A REPAIR/REPLACE POLICY $17,638 $2,295 Implemented
WV0594 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,704 $1,950 Implemented
WV0594 # 07 Y:2020 07 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,869 $90 Implemented
SF0544 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $920 $0 Implemented
SF0544 # 02 Y:2019 02 2019 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $1,610 $2,208 Implemented
SF0544 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,820 $9,188 Implemented
SF0544 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $249,622 $1,187,556 Implemented
SF0544 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,026 $11,278 Not Implemented
GT0927 # 05 Y:2019 05 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $308,141 $1,725,000 Not Implemented
GT0927 # 04 Y:2019 04 2019 INSULATE BARE EQUIPMENT $5,352 $6,398 Implemented