IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

22

matching recommendations
Reset
NAICS 32799 All Other Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TT0182 # 10 Y:2016 10 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $836 $600 Implemented
TT0182 # 09 Y:2016 09 2016 INSTALL TIMERS AND/OR THERMOSTATS $1,612 $500 Implemented
TT0182 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,822 $1,500 Implemented
TT0182 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,896 $3,000 Not Implemented
TT0182 # 06 Y:2016 06 2016 UPGRADE CONTROLS ON COMPRESSORS $6,416 $19,000 Implemented
TT0182 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,956 $5,000 Implemented
TT0182 # 04 Y:2016 04 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $9,314 $4,000 Implemented
TT0182 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,055 $53,270 Implemented
TT0182 # 02 Y:2016 02 2016 INSULATE BARE EQUIPMENT $12,836 $61,050 Not Implemented
TT0182 # 01 Y:2016 01 2016 INSULATE BARE EQUIPMENT $13,618 $20,200 Not Implemented
TT0161 # 12 Y:2015 12 2015 INSTALL SPECTRAL REFLECTORS / DELAMP $202 $20 Not Implemented
TT0161 # 01 Y:2015 01 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $90,145 $45,000 Not Implemented
TT0161 # 11 Y:2015 11 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,222 $2,000 Not Implemented
TT0161 # 10 Y:2015 10 2015 ISOLATE HOT OR COLD EQUIPMENT $1,634 $600 Not Implemented
TT0161 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,583 $1,140 Not Implemented
TT0161 # 08 Y:2015 08 2015 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,785 $300 Not Implemented
TT0161 # 07 Y:2015 07 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $6,860 $12,000 Not Implemented
TT0161 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $12,012 $2,000 Not Implemented
TT0161 # 05 Y:2015 05 2015 INSULATE BARE EQUIPMENT $17,886 $6,135 Not Implemented
TT0161 # 04 Y:2015 04 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $19,704 $2,000 Not Implemented
TT0161 # 03 Y:2015 03 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $23,126 $10,000 Not Implemented
TT0161 # 02 Y:2015 02 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $26,125 $2,000 Not Implemented