IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

85

matching recommendations
Reset
NAICS 327999 All Other Miscellaneous Nonmetallic Mineral Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0116 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $138 $90 Implemented
CW0116 # 01 Y:2020 01 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $342 $1,350 Not Implemented
CW0116 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $46 $0 Implemented
CW0116 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $752 $70 Implemented
CW0116 # 06 Y:2020 06 2020 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $3,657 $2,615 Not Implemented
CW0116 # 07 Y:2020 07 2020 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $438 $0 Implemented
CW0116 # 05 Y:2020 05 2020 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $4,030 $19,360 Not Implemented
SF0544 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,026 $11,278 Not Implemented
SF0544 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $920 $0 Implemented
SF0544 # 05 Y:2019 05 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $249,622 $1,187,556 Implemented
SF0544 # 02 Y:2019 02 2019 MINIMIZE OVERFLOWS BY INSTALLING LEVEL CONTROLS $1,610 $2,208 Implemented
SF0544 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,820 $9,188 Implemented
SD0519 # 04 Y:2015 04 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,983 $16,500 Implemented
SD0519 # 05 Y:2015 05 2015 INSTALL TIMERS AND/OR THERMOSTATS $3,856 $210 Implemented
SD0519 # 03 Y:2015 03 2015 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $4,091 $8,805 Not Implemented
SD0519 # 02 Y:2015 02 2015 USE POWER DURING OFF-PEAK PERIODS $15,251 $10,325 Implemented
SD0519 # 01 Y:2015 01 2015 UPGRADE CONTROLS ON COMPRESSORS $15,876 $6,475 Implemented
SD0519 # 06 Y:2015 06 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,572 $1,500 Implemented
MA0714 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $4,919 $12,300 Not Implemented
MA0714 # 05 Y:2013 05 2013 INSULATE BARE EQUIPMENT $4,187 $7,500 Not Implemented
MA0714 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,354 $9,300 Not Implemented
MA0714 # 07 Y:2013 07 2013 OPTIMIZE PLANT POWER FACTOR $11,188 $13,500 Implemented
MA0714 # 02 Y:2013 02 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $9,831 $5,568 Implemented
MA0714 # 01 Y:2013 01 2013 BURN A LESS EXPENSIVE GRADE OF FUEL $64,988 $67,000 Implemented
MA0714 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,362 $13,800 Implemented