Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,725
matching recommendationsNAICS | 331 | Primary Metal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0295 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $36,113 | $1,750 | n/a |
UA0295 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $454 | $2,418 | n/a |
UA0295 # 03 Y:2025 | 03 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $85,871 | $42,000 | n/a |
UA0295 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,442 | $4,771 | n/a |
UA0295 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $62,000 | $8,591 | n/a |
UA0295 # 06 Y:2025 | 06 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $6,661 | $23,010 | n/a |
LE0596 # 08 Y:2025 | 08 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,365 | $24,074 | n/a |
LE0596 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,935 | $14,078 | n/a |
LE0596 # 04 Y:2025 | 04 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $10,210 | $8,000 | n/a |
LE0596 # 10 Y:2025 | 10 | 2025 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $90,409 | $240,000 | n/a |
LE0596 # 03 Y:2025 | 03 | 2025 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $26,110 | $14,500 | n/a |
LE0596 # 06 Y:2025 | 06 | 2025 | INSTALL OCCUPANCY SENSORS | $702 | $660 | n/a |
LE0596 # 01 Y:2025 | 01 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $7,008 | $2,000 | n/a |
LE0596 # 07 Y:2025 | 07 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,044 | $45,000 | n/a |
LE0596 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,874 | $2,600 | n/a |
LE0596 # 11 Y:2025 | 11 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $49,500 | $160,000 | n/a |
LE0596 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,423 | $5,658 | n/a |
LE0596 # 12 Y:2025 | 12 | 2025 | USE HEAT PUMP FOR SPACE CONDITIONING | $3,616 | $14,943 | n/a |
AS0603 # 01 Y:2025 | 01 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $320,000 | $104,670 | n/a |
AS0603 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $172,434 | $1,040,663 | n/a |
AS0603 # 07 Y:2025 | 07 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $478 | $246 | n/a |
AS0603 # 02 Y:2025 | 02 | 2025 | USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS | $279,654 | $313,240 | n/a |
AS0603 # 04 Y:2025 | 04 | 2025 | PAY BILLS ON TIME TO AVOID LATE FEES | $18,772 | $291 | n/a |
AS0603 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,172 | $545 | n/a |
AS0603 # 06 Y:2025 | 06 | 2025 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $1,156 | $949 | n/a |