Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,664
matching recommendationsNAICS | 331 | Primary Metal Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0320 # 14 Y:2005 | 14 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $457 | $430 | Implemented |
WV0320 # 15 Y:2005 | 15 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $438 | $80 | Implemented |
WV0320 # 16 Y:2005 | 16 | 2005 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $351 | $26 | Not Implemented |
UU0087 # 01 Y:2005 | 01 | 2005 | EXPAND OPERATIONS INTO UNUSED SPACE | $84,030 | $200,000 | Not Implemented |
UU0087 # 02 Y:2005 | 02 | 2005 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $9,270 | $0 | Not Implemented |
UU0087 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,180 | $3,040 | Not Implemented |
UU0087 # 04 Y:2005 | 04 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,680 | $240 | Not Implemented |
UU0087 # 05 Y:2005 | 05 | 2005 | OPTIMIZE PLANT POWER FACTOR | $470 | $2,900 | Not Implemented |
UD0722 # 01 Y:2005 | 01 | 2005 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $113,700 | $454,800 | Not Implemented |
UD0722 # 02 Y:2005 | 02 | 2005 | INSTALL OCCUPANCY SENSORS | $6,570 | $21,200 | Not Implemented |
UD0722 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,334 | $192 | Implemented |
UD0722 # 04 Y:2005 | 04 | 2005 | UPGRADE CONTROLS ON COMPRESSORS | $2,776 | $1,448 | Implemented |
UD0722 # 05 Y:2005 | 05 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,734 | $9,650 | Implemented |
UD0722 # 06 Y:2005 | 06 | 2005 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,730 | $0 | Not Implemented |
UD0722 # 07 Y:2005 | 07 | 2005 | INSTALL OCCUPANCY SENSORS | $104 | $102 | Implemented |
WV0318 # 01 Y:2005 | 01 | 2005 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $39,332 | $8,388 | Implemented |
WV0318 # 02 Y:2005 | 02 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,012 | $3,064 | Implemented |
WV0318 # 03 Y:2005 | 03 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,845 | $6,470 | Implemented |
WV0318 # 04 Y:2005 | 04 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $12,757 | $620 | Implemented |
WV0318 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,670 | $587 | Implemented |
WV0318 # 06 Y:2005 | 06 | 2005 | COVER OPEN TANKS | $5,974 | $12,120 | Not Implemented |
WV0318 # 07 Y:2005 | 07 | 2005 | DEVELOP A REPAIR/REPLACE POLICY | $4,198 | $330 | Implemented |
WV0318 # 08 Y:2005 | 08 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,582 | $11,537 | Not Implemented |
WV0318 # 09 Y:2005 | 09 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,258 | $360 | Implemented |
WV0318 # 10 Y:2005 | 10 | 2005 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,532 | $5,220 | Implemented |