IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
NAICS 331110 Iron and Steel Mills and Ferroalloy Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CW0128 # 02 Y:2023 02 2023 ADOPT IN-HOUSE MATERIAL GENERATION $215,269 $246,950 n/a
CW0128 # 03 Y:2023 03 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $956 $400 n/a
CW0128 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $2,001 $8,583 n/a
CW0128 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,453 $225 n/a
CW0128 # 06 Y:2023 06 2023 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $8,800 $26,211 n/a
CW0128 # 01 Y:2023 01 2023 UPGRADE CONTROLS ON COMPRESSORS $5,763 $4,760 n/a
WV0470 # 10 Y:2013 10 2013 DEVELOP A REPAIR/REPLACE POLICY $152 $380 Not Implemented
WV0470 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $620 $105 Implemented
WV0470 # 08 Y:2013 08 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,892 $3,300 Not Implemented
WV0470 # 07 Y:2013 07 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,736 $1,700 Implemented
WV0470 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,069 $2,050 Implemented
WV0470 # 05 Y:2013 05 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $4,422 $13,020 Not Implemented
WV0470 # 04 Y:2013 04 2013 RECOVER WASTE HEAT FROM EQUIPMENT $4,666 $1,080 Implemented
WV0470 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,807 $20,200 Not Implemented
WV0470 # 02 Y:2013 02 2013 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $16,582 $68,000 Implemented
WV0470 # 01 Y:2013 01 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $24,095 $2,500 Implemented
UD0808 # 23 Y:2009 23 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,412 $5,050 Not Implemented
UD0808 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $200,411 $425,000 Not Implemented
UD0808 # 02 Y:2009 02 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $108,914 $25,000 Not Implemented
UD0808 # 03 Y:2009 03 2009 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $95,164 $300,000 Not Implemented
UD0808 # 04 Y:2009 04 2009 OPTIMIZE PLANT POWER FACTOR $74,208 $223,000 Not Implemented
UD0808 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $68,888 $60,000 Not Implemented
UD0808 # 06 Y:2009 06 2009 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $67,977 $135,954 Not Implemented
UD0808 # 07 Y:2009 07 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,538 $59,100 Not Implemented
UD0808 # 08 Y:2009 08 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $43,197 $23,136 Not Implemented