IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

351

matching recommendations
Reset
NAICS 331210 Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0989 # 03 Y:2025 03 2025 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $42,149 $150,000 n/a
GT0989 # 09 Y:2025 09 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $29,893 $435,677 n/a
GT0989 # 02 Y:2025 02 2025 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $200 $100 n/a
GT0989 # 06 Y:2025 06 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,216 $5,400 n/a
GT0989 # 01 Y:2025 01 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $20,407 $2,600 n/a
GT0989 # 07 Y:2025 07 2025 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $23,815 $115,000 n/a
GT0989 # 05 Y:2025 05 2025 INSULATE BARE EQUIPMENT $442 $1,852 n/a
GT0989 # 08 Y:2025 08 2025 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $20,031 $100,000 n/a
GT0989 # 04 Y:2025 04 2025 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $430 $1,777 n/a
IC0315 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,991 $7,497 n/a
IC0315 # 10 Y:2024 10 2024 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $369,968 $14,366 n/a
IC0315 # 11 Y:2024 11 2024 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $12,134 $7,693 n/a
IC0315 # 04 Y:2024 04 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,069 $442 n/a
IC0315 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,133 $1,850 n/a
IC0315 # 08 Y:2024 08 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $525 $242 n/a
IC0315 # 09 Y:2024 09 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $2,224 $0 n/a
IC0315 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,478 $227 n/a
IC0315 # 05 Y:2024 05 2024 INSULATE BARE EQUIPMENT $6,223 $2,225 n/a
IC0315 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $82,148 $379,057 n/a
IC0315 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,959 $820 n/a
UD1065 # 01 Y:2023 01 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $589 $0 Not Implemented
UD1065 # 02 Y:2023 02 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $12,692 $430 Not Implemented
UD1065 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $19,345 $19,667 Not Implemented
UD1065 # 03 Y:2023 03 2023 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $38,039 $0 Not Implemented
UD1065 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,046 $952 Implemented