IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

791

matching recommendations
Reset
NAICS 33131 Alumina and Aluminum Production and Processing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0936 # 08 Y:2019 08 2019 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $96,885 $235,465 Not Implemented
LS1912 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,696 $50 Not Implemented
LS1912 # 02 Y:2019 02 2019 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $4,767 $150 Not Implemented
LS1912 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,179 $630 Not Implemented
LS1912 # 04 Y:2019 04 2019 INSTALL AUTOMATIC PACKING EQUIPMENT $1,164,856 $900,000 Not Implemented
LS1912 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $42,700 $46,200 Not Implemented
LS1912 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,657 $2,850 Not Implemented
LS1912 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $515 $1,198 Not Implemented
OR0716 # 01 Y:2019 01 2019 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $170,737 $8,015 Not Implemented
OR0716 # 02 Y:2019 02 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $96,953 $165,004 Implemented
OR0716 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $22,967 $10,000 Implemented
OR0716 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,289 $1,500 Implemented
OR0716 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,971 $1,200 Implemented
OR0716 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $9,287 $19,796 Not Implemented
OR0716 # 07 Y:2019 07 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,641 $23,504 Not Implemented
AS0458 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $229,273 $13,000 Implemented
AS0458 # 02 Y:2018 02 2018 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $141,718 $198,093 Not Implemented
AS0458 # 03 Y:2018 03 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $108,000 $34,970 Not Implemented
AS0458 # 04 Y:2018 04 2018 USE SOLAR HEAT FOR HEAT $15,016 $6,034 Not Implemented
AS0458 # 05 Y:2018 05 2018 INSTALL SKYLIGHTS $14,020 $33,868 Not Implemented
AS0458 # 06 Y:2018 06 2018 RECOVER AND REUSE COOLING WATER $3,500 $2,576 Not Implemented
AS0458 # 07 Y:2018 07 2018 COVER OPEN TANKS $1,285 $0 Not Implemented
AS0458 # 08 Y:2018 08 2018 AIR CONDITION ONLY SPACE NECESSARY $713 $312 Not Implemented
SU0464 # 01 Y:2018 01 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,408 $1,206 Not Implemented
SU0464 # 02 Y:2018 02 2018 INSULATE FEEDWATER TANK $637 $386 Implemented