Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 33131 | Alumina and Aluminum Production and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0242 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,412 | $62,026 | Not Implemented |
TT0242 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,394 | $110,050 | Not Implemented |
TT0242 # 04 Y:2020 | 04 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $13,945 | $1,900 | Not Implemented |
TT0242 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,251 | $263 | Not Implemented |
TT0242 # 06 Y:2020 | 06 | 2020 | INSTALL TIMERS AND/OR THERMOSTATS | $1,854 | $1,700 | Not Implemented |
TT0242 # 01 Y:2020 | 01 | 2020 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,906,442 | $4,500,000 | Implemented |
TT0095 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,067 | $8,672 | Not Implemented |
TT0095 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $538 | $625 | Not Implemented |
TT0095 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $39,751 | $33,080 | Implemented |
TT0095 # 06 Y:2012 | 06 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $190 | $10 | Not Implemented |
TT0095 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,668 | $7,000 | Implemented |
TT0095 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $1,770 | $1,195 | Implemented |
TT0095 # 03 Y:2012 | 03 | 2012 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $9,681 | $50,000 | Not Implemented |
TT0095 # 02 Y:2012 | 02 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $165,758 | $300,000 | Not Implemented |
TT0095 # 01 Y:2012 | 01 | 2012 | REPLACE BOILER | $8,685 | $5,000 | Implemented |
TT0005 # 09 Y:2007 | 09 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,245 | $44,608 | Not Implemented |
TT0005 # 08 Y:2007 | 08 | 2007 | ADJUST BURNERS FOR EFFICIENT OPERATION | $47,304 | $2,000 | Implemented |
TT0005 # 07 Y:2007 | 07 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,808 | $5,060 | Not Implemented |
TT0005 # 06 Y:2007 | 06 | 2007 | OPTIMIZE PLANT POWER FACTOR | $62,060 | $50,000 | Implemented |
TT0005 # 05 Y:2007 | 05 | 2007 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $1,002 | $200 | Implemented |
TT0005 # 04 Y:2007 | 04 | 2007 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $864 | $4,080 | Not Implemented |
TT0005 # 03 Y:2007 | 03 | 2007 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $4,206 | $400 | Not Implemented |
TT0005 # 02 Y:2007 | 02 | 2007 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,570 | $4,816 | Implemented |
TT0005 # 01 Y:2007 | 01 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $10,913 | $7,515 | Not Implemented |