Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
25
matching recommendationsNAICS | 331314 | Secondary Smelting and Alloying of Aluminum |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0306 # 04 Y:2010 | 04 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,549 | $1,800 | Not Implemented |
LE0306 # 03 Y:2010 | 03 | 2010 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $12,691 | $10,000 | Not Implemented |
LE0306 # 02 Y:2010 | 02 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,392 | $12,700 | Not Implemented |
LE0306 # 01 Y:2010 | 01 | 2010 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $75,618 | $68,000 | Not Implemented |
LE0261 # 01 Y:2007 | 01 | 2007 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $196,792 | $500 | Not Implemented |
LE0261 # 09 Y:2007 | 09 | 2007 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $3,985 | $300 | Not Implemented |
LE0261 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,476 | $150 | Implemented |
LE0261 # 07 Y:2007 | 07 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,155 | $1,500 | Implemented |
LE0261 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,137 | $5,000 | Not Implemented |
LE0261 # 05 Y:2007 | 05 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,661 | $100 | Implemented |
LE0261 # 04 Y:2007 | 04 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $15,461 | $20 | Implemented |
LE0261 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,454 | $12,000 | Not Implemented |
LE0261 # 02 Y:2007 | 02 | 2007 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $71,526 | $75,000 | Not Implemented |
LE0235 # 01 Y:2006 | 01 | 2006 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $1,380,000 | $3,000,000 | Not Implemented |
LE0235 # 12 Y:2006 | 12 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,006 | $1,000 | Implemented |
LE0235 # 11 Y:2006 | 11 | 2006 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $9,908 | $7,500 | Implemented |
LE0235 # 10 Y:2006 | 10 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $11,211 | $15,000 | Not Implemented |
LE0235 # 09 Y:2006 | 09 | 2006 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $12,444 | $6,000 | Implemented |
LE0235 # 08 Y:2006 | 08 | 2006 | REDESIGN PROCESS | $19,713 | $1,000 | Not Implemented |
LE0235 # 07 Y:2006 | 07 | 2006 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $22,786 | $30,000 | Implemented |
LE0235 # 06 Y:2006 | 06 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $63,349 | $20,000 | Implemented |
LE0235 # 05 Y:2006 | 05 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $66,844 | $100 | Implemented |
LE0235 # 04 Y:2006 | 04 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $73,559 | $36,000 | Not Implemented |
LE0235 # 03 Y:2006 | 03 | 2006 | UPGRADE OBSOLETE EQUIPMENT | $192,971 | $250,000 | Implemented |
LE0235 # 02 Y:2006 | 02 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $202,503 | $95,000 | Implemented |