Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
21
matching recommendationsNAICS | 33142 | Copper Rolling, Drawing, Extruding, and Alloying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0303 # 02 Y:2004 | 02 | 2004 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $20,788 | $0 | Not Implemented |
NC0303 # 03 Y:2004 | 03 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $18,426 | $18,825 | Not Implemented |
NC0303 # 04 Y:2004 | 04 | 2004 | REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE | $11,844 | $18,280 | Not Implemented |
NC0303 # 05 Y:2004 | 05 | 2004 | REDESIGN PROCESS | $73,700 | $35,000 | Not Implemented |
NC0303 # 06 Y:2004 | 06 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,224 | $100 | Implemented |
NC0303 # 07 Y:2004 | 07 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,085 | $1,385 | Not Implemented |
NC0303 # 01 Y:2004 | 01 | 2004 | ADOPT IN-HOUSE MATERIAL GENERATION | $34,730 | $120,000 | Not Implemented |
WV0288 # 14 Y:2004 | 14 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $95 | $200 | Implemented |
WV0288 # 13 Y:2004 | 13 | 2004 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $203 | $25 | Implemented |
WV0288 # 12 Y:2004 | 12 | 2004 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $804 | $1,100 | Not Implemented |
WV0288 # 11 Y:2004 | 11 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,876 | $3,500 | Not Implemented |
WV0288 # 10 Y:2004 | 10 | 2004 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,739 | $575 | Implemented |
WV0288 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,932 | $50 | Implemented |
WV0288 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,040 | $3,210 | Not Implemented |
WV0288 # 07 Y:2004 | 07 | 2004 | DEVELOP A REPAIR/REPLACE POLICY | $4,573 | $1,000 | Implemented |
WV0288 # 06 Y:2004 | 06 | 2004 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $5,772 | $27,600 | Implemented |
WV0288 # 05 Y:2004 | 05 | 2004 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $6,212 | $1,200 | Implemented |
WV0288 # 04 Y:2004 | 04 | 2004 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,061 | $250 | Not Implemented |
WV0288 # 03 Y:2004 | 03 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $9,120 | $700 | Not Implemented |
WV0288 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,141 | $360 | Implemented |
WV0288 # 01 Y:2004 | 01 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,469 | $2,195 | Not Implemented |