IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
Reset
NAICS 33142 Copper Rolling, Drawing, Extruding, and Alloying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0620 # 02 Y:2007 02 2007 HEAT WATER WITH EXHAUST HEAT $25,021 $44,540 Implemented
MA0620 # 10 Y:2007 10 2007 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,323 $6,022 Implemented
MA0620 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,751 $3,025 Implemented
MA0620 # 08 Y:2007 08 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,784 $20,175 Not Implemented
MA0620 # 07 Y:2007 07 2007 USE RADIANT HEATER FOR SPOT HEATING $7,012 $10,990 Not Implemented
MA0620 # 06 Y:2007 06 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,532 $8,100 Implemented
MA0620 # 05 Y:2007 05 2007 INSTALL TIMERS AND/OR THERMOSTATS $9,514 $1,776 Implemented
MA0620 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,535 $24,820 Implemented
MA0620 # 03 Y:2007 03 2007 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $23,390 $85,000 Not Implemented
MA0620 # 01 Y:2007 01 2007 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $84,828 $100,250 Not Implemented
NC0358 # 01 Y:2007 01 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $6,682 $13,000 Not Implemented
NC0358 # 02 Y:2007 02 2007 DEVELOP A REPAIR/REPLACE POLICY $3,860 $2,751 Not Implemented
NC0358 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $5,543 $24,660 Not Implemented
NC0358 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $308 $100 Implemented
NC0358 # 05 Y:2007 05 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $327 $316 Implemented
NC0358 # 06 Y:2007 06 2007 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $767 $1,000 Not Implemented
NC0358 # 07 Y:2007 07 2007 USE PHOTOCELL CONTROLS $187 $200 Not Implemented
NC0358 # 08 Y:2007 08 2007 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING $805,000 $56,000 Not Implemented