Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 2007 |
Principal Product | Copper tubing |
NAICS | 331420 - Copper Rolling, Drawing, Extruding, and Alloying |
SIC | 3351 - Copper Rolling And Drawing |
Sales | $100,000,000-$500,000,000 |
# of Employees | 350 |
Plant Area (Sq.Ft.) | 400,000 |
Annual Production | 60,000,000 Pounds |
Production Hrs. Annual | 8,400 |
Location (State) | VA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,851,981 | 44,290,334 | kWh | $0.04 |
Electricity Fees | $362,232 | - | $ | - |
Natural Gas | $960,175 | 77,701 | MMBtu | $12.36 |
TOTAL ENERGY COSTS | $3,174,388 | |||
RECOMMENDED SAVINGS* | $822,674 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $635 |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | $ | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS |
Savings: $6,682 Cost: $13,000 |
$2,521 | 59,189 | $4,161 | 337 | - | - | - | - | - | - |
$2,521 59,189 kWh |
$4,161 337 MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY |
Savings: $3,860 Cost: $2,751 |
$3,860 | 90,608 | - | - | - | - | - | - | - | - |
$3,860 90,608 kWh |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,543 Cost: $24,660 |
$(-187) | (-4,380) | $5,730 | 464 | - | - | - | - | - | - |
$(-187) (-4,380) kWh |
$5,730 464 MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $308 Cost: $100 |
$1,508 | 35,400 | - | - | $(-900) | - | $(-300) | - | - | - |
$1,508 35,400 kWh |
- - MMBtu |
$(-900) - $ |
$(-300) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $327 Cost: $316 |
$327 | 7,666 | - | - | - | - | - | - | - | - |
$327 7,666 kWh |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE |
Savings: $767 Cost: $1,000 |
$767 | 18,000 | - | - | - | - | - | - | - | - |
$767 18,000 kWh |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $187 Cost: $200 |
$187 | 4,380 | - | - | - | - | - | - | - | - |
$187 4,380 kWh |
- - MMBtu |
- - $ |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.121 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING |
Savings: $805,000 Cost: $56,000 |
- | - | - | - | - | - | - | - | $805,000 | - |
- - kWh |
- - MMBtu |
- - $ |
- - $ |
$805,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $822,674 Cost: $98,027 |
$8,983 | 210,863 | $9,891 | 801 | $(-900) | - | $(-300) | - | $805,000 | - | $8,983 210,863 kWh |
$9,891 801 MMBtu |
$(-900) - $ |
$(-300) - $ |
$805,000 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $635 Cost: $416 |
$1,835 | 43,066 | - | - | $(-900) | - | $(-300) | - | - | - | $1,835 43,066 kWh |
- - MMBtu |
$(-900) - $ |
$(-300) - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | $ | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product | Electricity Usage | Natural Gas | Personnel Changes | Ancillary Material Cost | Primary Product |