IAC logo
IAC Assessment: NC0358
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0358
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2007
Principal Product Copper tubing
NAICS 331420 - Copper Rolling, Drawing, Extruding, and Alloying
SIC 3351 - Copper Rolling And Drawing
Sales $100,000,000-$500,000,000
# of Employees 350
Plant Area (Sq.Ft.) 400,000
Annual Production 60,000,000 Pounds
Production Hrs. Annual 8,400
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,851,981 44,290,334 kWh $0.04
Electricity Fees $362,232 - $ -
Natural Gas $960,175 77,701 MMBtu $12.36
TOTAL ENERGY COSTS $3,174,388
RECOMMENDED SAVINGS* $822,674 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $635
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Primary Product
$ kWh $ MMBtu $ $ $ $ $ $
01: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$6,682
Cost:
$13,000
$2,521 59,189 $4,161 337 - - - - - - $2,521
59,189
kWh
$4,161
337
MMBtu
-
-
$
-
-
$
-
-
$
02: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$3,860
Cost:
$2,751
$3,860 90,608 - - - - - - - - $3,860
90,608
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$5,543
Cost:
$24,660
$(-187) (-4,380) $5,730 464 - - - - - - $(-187)
(-4,380)
kWh
$5,730
464
MMBtu
-
-
$
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$308
Cost:
$100
$1,508 35,400 - - $(-900) - $(-300) - - - $1,508
35,400
kWh
-
-
MMBtu
$(-900)
-
$
$(-300)
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$327
Cost:
$316
$327 7,666 - - - - - - - - $327
7,666
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
06: 2.7133 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE Savings:
$767
Cost:
$1,000
$767 18,000 - - - - - - - - $767
18,000
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
07: 2.7134 USE PHOTOCELL CONTROLS Savings:
$187
Cost:
$200
$187 4,380 - - - - - - - - $187
4,380
kWh
-
-
MMBtu
-
-
$
-
-
$
-
-
$
08: 4.121 MAINTAIN CLEAN CONDITIONS BEFORE PAINTING Savings:
$805,000
Cost:
$56,000
- - - - - - - - $805,000 - -
-
kWh
-
-
MMBtu
-
-
$
-
-
$
$805,000
-
$
TOTAL RECOMMENDED Savings:
$822,674
Cost:
$98,027
$8,983 210,863 $9,891 801 $(-900) - $(-300) - $805,000 - $8,983
210,863
kWh
$9,891
801
MMBtu
$(-900)
-
$
$(-300)
-
$
$805,000
-
$
TOTAL IMPLEMENTED Savings:
$635
Cost:
$416
$1,835 43,066 - - $(-900) - $(-300) - - - $1,835
43,066
kWh
-
-
MMBtu
$(-900)
-
$
$(-300)
-
$
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $ $ $
Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Primary Product Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Primary Product