Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
14
matching recommendationsNAICS | 33149 | Nonferrous Metal (except Copper and Aluminum) Rolling, Drawing, Extruding, and Alloying |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0356 # 01 Y:2013 | 01 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,905 | $5,175 | Implemented |
LE0356 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,126 | $3,215 | Implemented |
LE0356 # 05 Y:2013 | 05 | 2013 | ADJUST BURNERS FOR EFFICIENT OPERATION | $756 | $0 | Implemented |
LE0356 # 09 Y:2013 | 09 | 2013 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,341 | $0 | Implemented |
LE0356 # 10 Y:2013 | 10 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,399 | $3,700 | Implemented |
LE0356 # 12 Y:2013 | 12 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,638 | $1,086 | Implemented |
LE0310 # 01 Y:2010 | 01 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $26,531 | $10,000 | Implemented |
LE0310 # 02 Y:2010 | 02 | 2010 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,363 | $200 | Implemented |
LE0310 # 03 Y:2010 | 03 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,484 | $1,420 | Implemented |
LE0310 # 04 Y:2010 | 04 | 2010 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $3,986 | $2,500 | Implemented |
LE0310 # 05 Y:2010 | 05 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,225 | $20 | Implemented |
LE0274 # 04 Y:2008 | 04 | 2008 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $2,421 | $4,680 | Implemented |
LE0274 # 05 Y:2008 | 05 | 2008 | USE SYNTHETIC LUBRICANT | $1,064 | $500 | Implemented |
LE0274 # 06 Y:2008 | 06 | 2008 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $189 | $280 | Implemented |