Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,045
matching recommendationsNAICS | 3315 | Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0671 # 02 Y:2016 | 02 | 2016 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $190,362 | $300,000 | Not Implemented |
OR0671 # 03 Y:2016 | 03 | 2016 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $24,528 | $1,495 | Not Implemented |
OR0671 # 04 Y:2016 | 04 | 2016 | REDESIGN PROCESS | $4,005 | $3,500 | Not Implemented |
OR0671 # 05 Y:2016 | 05 | 2016 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $2,295 | $1,000 | Implemented |
WM0086 # 01 Y:2016 | 01 | 2016 | USE BATCH FIRING WITH KILN "FURNITURE" SPECIFICALLY DESIGNED | $3,034 | $400 | Not Implemented |
WM0086 # 02 Y:2016 | 02 | 2016 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,302 | $4,004 | Not Implemented |
WM0086 # 03 Y:2016 | 03 | 2016 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $533 | $276 | Not Implemented |
WM0086 # 04 Y:2016 | 04 | 2016 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $548 | $318 | Not Implemented |
WM0086 # 05 Y:2016 | 05 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $258 | $200 | Not Implemented |
WM0086 # 06 Y:2016 | 06 | 2016 | INSTALL OCCUPANCY SENSORS | $481 | $320 | Not Implemented |
WM0086 # 07 Y:2016 | 07 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $220 | $321 | Not Implemented |
UD0948 # 01 Y:2016 | 01 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $353,342 | $60,000 | Not Implemented |
UD0948 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $23,367 | $2,838 | Not Implemented |
UD0948 # 03 Y:2016 | 03 | 2016 | RECOVER WASTE HEAT FROM EQUIPMENT | $49,905 | $20,000 | Not Implemented |
UD0948 # 04 Y:2016 | 04 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,398 | $0 | Implemented |
UD0948 # 05 Y:2016 | 05 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,997 | $50 | Not Implemented |
UD0948 # 06 Y:2016 | 06 | 2016 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $87,713 | $52,000 | Implemented |
UD0948 # 07 Y:2016 | 07 | 2016 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $38,094 | $0 | Implemented |
UD0948 # 08 Y:2016 | 08 | 2016 | OPTIMIZE PLANT POWER FACTOR | $11,880 | $60,000 | Not Implemented |
UD0948 # 09 Y:2016 | 09 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $105,009 | $700 | Not Implemented |
UD0948 # 10 Y:2016 | 10 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,006 | $5,000 | Not Implemented |
UD0948 # 11 Y:2016 | 11 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,945 | $360,069 | Implemented |
UD0948 # 12 Y:2016 | 12 | 2016 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $195,456 | $17,000 | Not Implemented |
BD0484 # 01 Y:2016 | 01 | 2016 | INSTALL OCCUPANCY SENSORS | $13,713 | $3,180 | n/a |
BD0484 # 02 Y:2016 | 02 | 2016 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $12,305 | $4,540 | n/a |