IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,045

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0538 # 02 Y:2003 02 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $33,322 $76,300 Not Implemented
MA0538 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $31,418 $1,200 Implemented
MA0538 # 04 Y:2003 04 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $13,650 $60,800 Implemented
MA0538 # 05 Y:2003 05 2003 COVER OPEN TANKS $12,160 $39,000 Not Implemented
MA0538 # 06 Y:2003 06 2003 USE RADIANT HEATER FOR SPOT HEATING $10,594 $44,750 Not Implemented
MA0538 # 07 Y:2003 07 2003 OPTIMIZE PLANT POWER FACTOR $10,424 $31,667 Not Implemented
MA0538 # 08 Y:2003 08 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,238 $85 Implemented
UM0235 # 01 Y:2003 01 2003 REDUCE SCRAP PRODUCTION $109,333 $9,600 Not Implemented
UM0235 # 02 Y:2003 02 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $96,000 $300,000 Not Implemented
UM0235 # 03 Y:2003 03 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,576 $9,600 Implemented
UM0235 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,470 $9,227 Not Implemented
UM0235 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,415 $675 Implemented
GT0759 # 01 Y:2003 01 2003 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $5,870 $3,000 Implemented
GT0759 # 02 Y:2003 02 2003 INSULATE BARE EQUIPMENT $770,950 $340,200 Not Implemented
GT0759 # 03 Y:2003 03 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $33,765 $188,200 Implemented
GT0759 # 04 Y:2003 04 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $200,910 $20,900 n/a
GT0759 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $157,690 $210,000 n/a
GT0759 # 06 Y:2003 06 2003 IMPROVE COMBUSTION CONTROL CAPABILITY $287,380 $24,500 n/a
GT0759 # 07 Y:2003 07 2003 USE RADIANT HEATER FOR SPOT HEATING $5,960 $2,190 Implemented
GT0759 # 08 Y:2003 08 2003 RECOVER WASTE HEAT FROM EQUIPMENT $89,620 $108,930 Implemented
GT0756 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $510 $1,100 n/a
GT0756 # 02 Y:2003 02 2003 COVER OPEN TANKS $18,300 $3,000 n/a
GT0756 # 03 Y:2003 03 2003 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $22,800 $5,610 n/a
GT0756 # 04 Y:2003 04 2003 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,950 $1,620 n/a
GT0756 # 05 Y:2003 05 2003 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $10,000 $35,955 n/a