Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | Loyola Marymount University |
---|---|
Assessment Year | 2004 |
Principal Product | Die Castings |
NAICS | 331523 - Nonferrous Metal Die-Casting Foundries |
SIC | 3363 - Aluminum Die-castings |
Sales | $5,000,000-$10,000,000 |
# of Employees | 50 |
Plant Area (Sq.Ft.) | 22,000 |
Annual Production | 2,000,000 Pounds |
Production Hrs. Annual | 3,875 |
Location (State) | CA |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $226,375 | 1,799,070 | kWh | $0.13 |
Electricity Demand | $63,120 | 4,800 | kW-months/year | $13.15 |
Electricity Fees | $1,846 | - | $ | - |
Natural Gas | $98,568 | 18,890 | MMBtu | $5.22 |
TOTAL ENERGY COSTS | $389,909 | |||
RECOMMENDED SAVINGS* | $69,200 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $2,670 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,854 Cost: $5,078 |
$2,327 | 17,939 | $527 | 65 | - | - | - | - |
$2,327 17,939 kWh |
$527 65 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $2,564 Cost: - |
$2,055 | 16,445 | $509 | 50 | - | - | - | - |
$2,055 16,445 kWh |
$509 50 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $349 Cost: $267 |
$272 | 2,172 | $77 | 10 | - | - | - | - |
$272 2,172 kWh |
$77 10 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $5,866 Cost: $16,975 |
$4,808 | 38,565 | $1,058 | 133 | - | - | - | - |
$4,808 38,565 kWh |
$1,058 133 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM |
Savings: $1,181 Cost: $260 |
- | - | - | - | $1,181 | 239 | - | - |
- - kWh |
- - kW-months/year |
$1,181 239 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,079 Cost: $120 |
- | - | - | - | $1,079 | 219 | - | - |
- - kWh |
- - kW-months/year |
$1,079 219 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,489 Cost: $368 |
$901 | 7,212 | $178 | 23 | $410 | 83 | - | - |
$901 7,212 kWh |
$178 23 kW-months/year |
$410 83 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $40,318 Cost: $55,000 |
$39,396 | 330,214 | $7,182 | 900 | $(-6,260) | (-157) | - | - |
$39,396 330,214 kWh |
$7,182 900 kW-months/year |
$(-6,260) (-157) MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $13,500 Cost: - |
- | - | - | - | - | - | $13,500 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$13,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $69,200 Cost: $78,068 |
$49,759 | 412,547 | $9,531 | 1,181 | $(-3,590) | 384 | $13,500 | - | $49,759 412,547 kWh |
$9,531 1,181 kW-months/year |
$(-3,590) 384 MMBtu |
$13,500 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $2,670 Cost: $628 |
$901 | 7,212 | $178 | 23 | $1,591 | 322 | - | - | $901 7,212 kWh |
$178 23 kW-months/year |
$1,591 322 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Personnel Changes |