IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

317

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0732 # 07 Y:2006 07 2006 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,718 $0 Implemented
UD0732 # 08 Y:2006 08 2006 IMPROVE COMBUSTION CONTROL CAPABILITY $9,263 $0 Implemented
UD0732 # 09 Y:2006 09 2006 INSULATE BARE EQUIPMENT $3,480 $418 Not Implemented
UD0732 # 10 Y:2006 10 2006 UPGRADE CONTROLS ON COMPRESSORS $2,569 $0 Implemented
UD0732 # 11 Y:2006 11 2006 INSULATE BARE EQUIPMENT $1,477 $910 Not Implemented
UD0732 # 12 Y:2006 12 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,253 $0 Not Implemented
UD0732 # 13 Y:2006 13 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,160 $0 Implemented
UD0732 # 14 Y:2006 14 2006 REPAIR AND ELIMINATE STEAM LEAKS $1,138 $600 Implemented
UD0732 # 15 Y:2006 15 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $783 $720 Implemented
UD0726 # 01 Y:2005 01 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $222,216 $3,730 Implemented
UD0726 # 02 Y:2005 02 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $157,981 $295,540 Not Implemented
UD0726 # 03 Y:2005 03 2005 USE OPTIMUM THICKNESS INSULATION $113,135 $17,165 Not Implemented
UD0726 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $93,662 $72,100 Implemented
UD0726 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,707 $93,840 Implemented
UD0726 # 06 Y:2005 06 2005 REDUCE VENTILATION AIR $26,800 $0 Implemented
UD0726 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $19,788 $4,000 Implemented
UD0726 # 08 Y:2005 08 2005 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $19,593 $40,000 Not Implemented
UD0726 # 09 Y:2005 09 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,470 $3,940 Not Implemented
UD0726 # 10 Y:2005 10 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,819 $12,560 Implemented
UD0726 # 11 Y:2005 11 2005 COVER OPEN TANKS $4,429 $1,200 Implemented
UD0726 # 12 Y:2005 12 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,280 $736 Implemented
UD0726 # 13 Y:2005 13 2005 UPGRADE CONTROLS ON COMPRESSORS $3,679 $0 Implemented
UD0726 # 14 Y:2005 14 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,948 $500 Not Implemented
UD0726 # 15 Y:2005 15 2005 CHECK FOR ACCURACY OF UTILITY / POWER METERS $1,554 $0 Implemented
UD0726 # 16 Y:2005 16 2005 UPGRADE CONTROLS ON COMPRESSORS $1,253 $0 Implemented