IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
NAICS 3315 Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0741 # 06 Y:2015 06 2015 INSTALL / REPAIR INSULATION ON STEAM LINES $1,308 $2,775 Not Implemented
MA0741 # 05 Y:2015 05 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,279 $7,050 Not Implemented
MA0741 # 04 Y:2015 04 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $24,147 $29,732 Not Implemented
MA0741 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $131,224 $279,750 Not Implemented
MA0741 # 02 Y:2015 02 2015 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $91,436 $5,000 Not Implemented
MA0741 # 03 Y:2015 03 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,787 $14,025 Not Implemented
MA0647 # 04 Y:2009 04 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $372 $400 Not Implemented
MA0647 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $458 $0 Not Implemented
MA0647 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,543 $1,200 Implemented
MA0647 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $20,325 $30,000 Not Implemented
MA0553 # 07 Y:2004 07 2004 INSULATE FEEDWATER TANK $910 $550 Implemented
MA0553 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,228 $600 Implemented
MA0553 # 05 Y:2004 05 2004 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,918 $1,039 Not Implemented
MA0553 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,977 $12,543 Implemented
MA0553 # 03 Y:2004 03 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,980 $9,830 Not Implemented
MA0553 # 02 Y:2004 02 2004 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,555 $15,605 Implemented
MA0553 # 01 Y:2004 01 2004 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $41,580 $20,000 Not Implemented