Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
127
matching recommendationsNAICS | 3315 | Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0013 # 05 Y:2007 | 05 | 2007 | USE OPTIMUM THICKNESS INSULATION | $3,027 | $279 | Not Implemented |
UA0013 # 03 Y:2007 | 03 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,315 | $47,838 | Implemented |
UA0013 # 04 Y:2007 | 04 | 2007 | INSTALL OCCUPANCY SENSORS | $17,411 | $13,088 | Implemented |
UA0013 # 01 Y:2007 | 01 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,423 | $700 | Implemented |
UA0013 # 02 Y:2007 | 02 | 2007 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,905 | $0 | Not Implemented |
UA0013 # 07 Y:2007 | 07 | 2007 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,856 | $0 | Implemented |
UA0013 # 06 Y:2007 | 06 | 2007 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $10,112 | $6,898 | Not Implemented |
UM0330 # 04 Y:2007 | 04 | 2007 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,732 | $1,300 | Not Implemented |
UM0330 # 07 Y:2007 | 07 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $954 | $1,500 | Not Implemented |
UM0330 # 03 Y:2007 | 03 | 2007 | REDUCE VENTILATION AIR | $1,775 | $516 | Not Implemented |
UM0330 # 08 Y:2007 | 08 | 2007 | COVER OPEN TANKS | $733 | $1,000 | Not Implemented |
UM0330 # 05 Y:2007 | 05 | 2007 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,605 | $500 | Not Implemented |
UM0330 # 02 Y:2007 | 02 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,366 | $5,250 | Not Implemented |
UM0330 # 01 Y:2007 | 01 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $17,750 | $12,000 | Not Implemented |
UM0330 # 06 Y:2007 | 06 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,228 | $4,500 | Not Implemented |
UM0329 # 05 Y:2007 | 05 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,455 | $6,300 | Implemented |
UM0329 # 04 Y:2007 | 04 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $40,784 | $265,000 | Not Implemented |
UM0329 # 03 Y:2007 | 03 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $74,880 | $39,375 | Implemented |
UM0329 # 01 Y:2007 | 01 | 2007 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $154,115 | $300,000 | Not Implemented |
UM0329 # 02 Y:2007 | 02 | 2007 | COVER OPEN TANKS | $115,389 | $140,000 | Implemented |
UM0326 # 02 Y:2007 | 02 | 2007 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $8,825 | $13,130 | Implemented |
UM0326 # 09 Y:2007 | 09 | 2007 | INSTALL OCCUPANCY SENSORS | $253 | $600 | Implemented |
UM0326 # 08 Y:2007 | 08 | 2007 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,092 | $204 | Implemented |
UM0326 # 04 Y:2007 | 04 | 2007 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,591 | $500 | Implemented |
UM0326 # 03 Y:2007 | 03 | 2007 | COVER OPEN TANKS | $4,631 | $220 | Implemented |