IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
Reset
NAICS 33151 Ferrous Metal Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1037 # 04 Y:2021 04 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,155 $4,128 Implemented
OK1037 # 01 Y:2021 01 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,395 $2,804 Implemented
OK1037 # 03 Y:2021 03 2021 RECOVER WASTE HEAT FROM EQUIPMENT $587 $955 Not Implemented
OK1037 # 02 Y:2021 02 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,825 $0 Not Implemented
OK1037 # 05 Y:2021 05 2021 INSTALL TIMERS AND/OR THERMOSTATS $206 $120 Implemented
OK1037 # 06 Y:2021 06 2021 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $875 $298 Not Implemented
OK1033 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,570 $27,786 Implemented
OK1033 # 03 Y:2020 03 2020 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $262 $700 Implemented
OK1033 # 05 Y:2020 05 2020 USE DEMAND CONTROLLER OR LOAD SHEDDER $2,056 $671 Not Implemented
OK1033 # 04 Y:2020 04 2020 INSTALL TIMERS AND/OR THERMOSTATS $343 $0 Not Implemented
OK1033 # 01 Y:2020 01 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,433 $2,100 Implemented
OK0881 # 14 Y:2014 14 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $381 $1,728 Not Implemented
OK0881 # 13 Y:2014 13 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,828 $18,850 Not Implemented
OK0881 # 12 Y:2014 12 2014 INSTALL SET-BACK TIMERS $6,977 $3,900 Not Implemented
OK0881 # 11 Y:2014 11 2014 INSTALL TIMERS AND/OR THERMOSTATS $463 $181 Not Implemented
OK0881 # 10 Y:2014 10 2014 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $840 $910 Not Implemented
OK0881 # 09 Y:2014 09 2014 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $267 $56 Implemented
OK0881 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,194 $4,592 Not Implemented
OK0881 # 07 Y:2014 07 2014 INSTALL OCCUPANCY SENSORS $3,196 $1,170 Not Implemented
OK0881 # 06 Y:2014 06 2014 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,894 $7,100 Implemented
OK0881 # 05 Y:2014 05 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,393 $0 Implemented
OK0881 # 04 Y:2014 04 2014 USE COMPRESSOR AIR FILTERS $721 $112 Implemented
OK0881 # 03 Y:2014 03 2014 RECOVER WASTE HEAT FROM EQUIPMENT $891 $847 Not Implemented
OK0881 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,592 $3,432 Not Implemented
OK0881 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,989 $700 Implemented