Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 33151 | Ferrous Metal Foundries |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0968 # 14 Y:2017 | 14 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $687 | $1,810 | Not Implemented |
UD0968 # 02 Y:2017 | 02 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,800 | $0 | Not Implemented |
UD0968 # 01 Y:2017 | 01 | 2017 | REDUCE EXCESSIVE BOILER BLOWDOWN | $8,230 | $0 | Not Implemented |
UD0968 # 03 Y:2017 | 03 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,341 | $0 | Implemented |
UD0968 # 11 Y:2017 | 11 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $68,688 | $12,000 | Not Implemented |
UD0968 # 04 Y:2017 | 04 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,217 | $118 | Implemented |
UD0968 # 07 Y:2017 | 07 | 2017 | OPTIMIZE PLANT POWER FACTOR | $61,075 | $28,000 | Not Implemented |
UD0968 # 09 Y:2017 | 09 | 2017 | COVER OPEN TANKS | $234,848 | $564,850 | Not Implemented |
UD0968 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $80,368 | $6,000 | Not Implemented |
UD0968 # 08 Y:2017 | 08 | 2017 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $909,400 | $750,000 | Not Implemented |
UD0968 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,870 | $0 | Implemented |
UD0968 # 06 Y:2017 | 06 | 2017 | USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) | $87,734 | $2,000 | Not Implemented |
UD0968 # 16 Y:2017 | 16 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,850 | $38,175 | Implemented |
UD0968 # 17 Y:2017 | 17 | 2017 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $27,353 | $42,400 | Implemented |
UD0968 # 15 Y:2017 | 15 | 2017 | USE OPTIMUM THICKNESS INSULATION | $162 | $344 | Not Implemented |
UD0968 # 13 Y:2017 | 13 | 2017 | USE OPTIMUM TEMPERATURE | $4,293 | $0 | Implemented |
UD0968 # 12 Y:2017 | 12 | 2017 | INSULATE BARE EQUIPMENT | $31,081 | $33,760 | Not Implemented |
AM0731 # 05 Y:2017 | 05 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,140 | $310 | Not Implemented |
AM0731 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $770 | $1,360 | Not Implemented |
AM0731 # 07 Y:2017 | 07 | 2017 | USE SYNTHETIC LUBRICANT | $400 | $0 | Not Implemented |
AM0731 # 04 Y:2017 | 04 | 2017 | REPAIR OR REPLACE STEAM TRAPS | $1,470 | $180 | Not Implemented |
AM0731 # 03 Y:2017 | 03 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,790 | $660 | Not Implemented |
AM0731 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,440 | $10,010 | Not Implemented |
AM0731 # 01 Y:2017 | 01 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,980 | $5,000 | Not Implemented |
MZ0224 # 04 Y:2017 | 04 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $355 | $300 | Not Implemented |