IAC logo
IAC Assessment: UD0968
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0968
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 2017
Principal Product Steel Processing
NAICS 331513 - Steel Foundries (except Investment)
SIC 3325 - Steel Foundries, Nec
Sales $100,000,000-$500,000,000
# of Employees 115
Plant Area (Sq.Ft.) 360,000
Annual Production 466,497 Tons
Production Hrs. Annual 8,568
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $666,762 16,408,800 kWh $0.04
Electricity Demand $47,836 2,599 kW-months/year $18.41
Natural Gas $1,330,657 395,197 MMBtu $3.37
TOTAL ENERGY COSTS $2,752,696
RECOMMENDED SAVINGS* $1,562,997 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $78,924
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
01: 2.1241 REDUCE EXCESSIVE BOILER BLOWDOWN Savings:
$8,230
Cost:
-
- - - - $8,230 2,168 - - - - - - -
-
kWh
-
-
kW-months/year
$8,230
2,168
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,800
Cost:
-
- - - - $1,800 474 - - - - - - -
-
kWh
-
-
kW-months/year
$1,800
474
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,341
Cost:
-
$1,603 42,028 $1,738 88 - - - - - - - - $1,603
42,028
kWh
$1,738
88
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
04: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$4,217
Cost:
$118
$2,182 57,215 $2,035 101 - - - - - - - - $2,182
57,215
kWh
$2,035
101
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,870
Cost:
-
$1,153 30,240 $717 42 - - - - - - - - $1,153
30,240
kWh
$717
42
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
06: 3.1227 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) Savings:
$87,734
Cost:
$2,000
- - - - - - $87,734 5,072 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$87,734
5,072
Tgal
-
-
Tgal
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$61,075
Cost:
$28,000
- - $61,075 3,607 - - - - - - - - -
-
kWh
$61,075
3,607
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
08: 3.4111 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION Savings:
$909,400
Cost:
$750,000
$(-6,643) (-174,184) - - - - $449,013 56,737 $532,444 56,737 $(-65,414) - $(-6,643)
(-174,184)
kWh
-
-
kW-months/year
-
-
MMBtu
$449,013
56,737
Tgal
$532,444
56,737
Tgal
$(-65,414)
-
$
09: 2.2514 COVER OPEN TANKS Savings:
$234,848
Cost:
$564,850
- - - - $205,932 54,102 $28,916 3,653 - - - - -
-
kWh
-
-
kW-months/year
$205,932
54,102
MMBtu
$28,916
3,653
Tgal
-
-
Tgal
-
-
$
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$80,368
Cost:
$6,000
- - - - $80,368 21,170 - - - - - - -
-
kWh
-
-
kW-months/year
$80,368
21,170
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
11: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$68,688
Cost:
$12,000
- - - - $68,688 18,093 - - - - - - -
-
kWh
-
-
kW-months/year
$68,688
18,093
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
12: 2.2511 INSULATE BARE EQUIPMENT Savings:
$31,081
Cost:
$33,760
- - - - $31,081 8,187 - - - - - - -
-
kWh
-
-
kW-months/year
$31,081
8,187
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
13: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$4,293
Cost:
-
- - - - $4,293 1,131 - - - - - - -
-
kWh
-
-
kW-months/year
$4,293
1,131
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
14: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$687
Cost:
$1,810
- - - - $687 181 - - - - - - -
-
kWh
-
-
kW-months/year
$687
181
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
15: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$162
Cost:
$344
- - - - $162 43 - - - - - - -
-
kWh
-
-
kW-months/year
$162
43
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
16: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$37,850
Cost:
$38,175
$21,298 558,462 $16,552 782 - - - - - - - - $21,298
558,462
kWh
$16,552
782
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
17: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$27,353
Cost:
$42,400
$27,353 717,224 - - - - - - - - - - $27,353
717,224
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$1,562,997
Cost:
$1,479,457
$46,946 1,230,985 $82,117 4,620 $401,241 105,549 $565,663 65,463 $532,444 56,737 $(-65,414) - $46,946
1,230,985
kWh
$82,117
4,620
kW-months/year
$401,241
105,549
MMBtu
$565,663
65,463
Tgal
$532,444
56,737
Tgal
$(-65,414)
-
$
TOTAL IMPLEMENTED Savings:
$78,924
Cost:
$80,693
$53,589 1,405,169 $21,042 1,013 $4,293 1,131 - - - - - - $53,589
1,405,169
kWh
$21,042
1,013
kW-months/year
$4,293
1,131
MMBtu
-
-
Tgal
-
-
Tgal
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ Tgal $ $
Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Administrative Changes Electricity Usage Electricity Demand Natural Gas Water Usage Water Disposal Administrative Changes