IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

638

matching recommendations
Reset
NAICS 331511 Iron Foundries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0224 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $474 $663 Implemented
MZ0224 # 04 Y:2017 04 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $355 $300 Not Implemented
MZ0224 # 05 Y:2017 05 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $305 $700 Not Implemented
BS0094 # 01 Y:2017 01 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,740 $120 Implemented
BS0094 # 02 Y:2017 02 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $5,969 $390 Not Implemented
BS0094 # 03 Y:2017 03 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,142 $30,425 Implemented
UA0165 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,492 $9,795 Implemented
UA0165 # 02 Y:2016 02 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,678 $500 Not Implemented
UA0165 # 03 Y:2016 03 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,367 $52,490 Implemented
UA0165 # 04 Y:2016 04 2016 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,610 $4,226 Implemented
UA0165 # 05 Y:2016 05 2016 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $11,135 $28,500 Not Implemented
UA0165 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,116 $13,298 Not Implemented
UA0165 # 07 Y:2016 07 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,642 $950 Implemented
BD0484 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $13,713 $3,180 n/a
BD0484 # 02 Y:2016 02 2016 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $12,305 $4,540 n/a
BD0484 # 03 Y:2016 03 2016 USE RADIANT HEATER FOR SPOT HEATING $10,396 $23,100 n/a
BD0484 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,253 $19,236 n/a
BD0484 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,651 $60 n/a
BD0484 # 06 Y:2016 06 2016 USE PHOTOCELL CONTROLS $3,829 $2,400 n/a
BD0484 # 07 Y:2016 07 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,986 $2,268 n/a
BD0484 # 08 Y:2016 08 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,174 $620 n/a
BD0484 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,061 $674 n/a
BD0484 # 10 Y:2016 10 2016 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $12,780 $2,050 n/a
UA0149 # 01 Y:2015 01 2015 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $399,011 $500,000 Not Implemented
UA0149 # 02 Y:2015 02 2015 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $193,249 $400,000 Not Implemented