IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
Reset
NAICS 331524 Aluminum Foundries (except Die-Casting)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0233 # 06 Y:2025 06 2025 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $329 $810 n/a
WM0233 # 05 Y:2025 05 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $373 $3,136 n/a
WM0233 # 04 Y:2025 04 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,278 $0 n/a
WM0233 # 03 Y:2025 03 2025 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $2,094 $18,160 n/a
WM0233 # 02 Y:2025 02 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,262 $1,500 n/a
WM0233 # 01 Y:2025 01 2025 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $97,017 $800,000 n/a
IA0423 # 06 Y:2008 06 2008 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $11,415 $18,345 Not Implemented
IA0423 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $697 $1,001 Not Implemented
IA0423 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $516 $86 Implemented
IA0423 # 03 Y:2008 03 2008 INSTALL TIMERS AND/OR THERMOSTATS $1,639 $150 Not Implemented
IA0423 # 02 Y:2008 02 2008 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $443 $25 Implemented
IA0423 # 01 Y:2008 01 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,458 $617 Implemented
IA0404 # 06 Y:2007 06 2007 INSULATE BARE EQUIPMENT $5,712 $592 Not Implemented
IA0404 # 07 Y:2007 07 2007 REDUCE VENTILATION AIR $24,436 $4,500 Implemented
IA0404 # 05 Y:2007 05 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,428 $495 Implemented
IA0404 # 04 Y:2007 04 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,557 $38,557 Implemented
IA0404 # 03 Y:2007 03 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,817 $9,533 Implemented
IA0404 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,029 $1,440 Implemented
IA0404 # 01 Y:2007 01 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,930 $30 Implemented
IA0335 # 01 Y:2004 01 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,405 $25 Not Implemented
IA0335 # 09 Y:2004 09 2004 INSULATE BARE EQUIPMENT $1,097 $198 Not Implemented
IA0335 # 08 Y:2004 08 2004 INSULATE BARE EQUIPMENT $8,410 $6,902 Not Implemented
IA0335 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $11,767 $12,275 Implemented
IA0335 # 06 Y:2004 06 2004 INSTALL OCCUPANCY SENSORS $918 $1,729 Not Implemented
IA0335 # 05 Y:2004 05 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,647 $3,807 Implemented