Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
109
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1146 # 10 Y:2025 | 10 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $67,194 | $36,360 | n/a |
OK1146 # 08 Y:2025 | 08 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $20,326 | $16,391 | n/a |
OK1146 # 06 Y:2025 | 06 | 2025 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $7,470 | $1,913 | n/a |
OK1146 # 07 Y:2025 | 07 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $878 | $1,980 | n/a |
OK1146 # 02 Y:2025 | 02 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,442 | $1,920 | n/a |
OK1146 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,188 | $0 | n/a |
OK1146 # 04 Y:2025 | 04 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,445 | $2,615 | n/a |
OK1146 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $723 | $621 | n/a |
OK1146 # 09 Y:2025 | 09 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $12,341 | $218,400 | n/a |
OK1146 # 01 Y:2025 | 01 | 2025 | OPTIMIZE PLANT POWER FACTOR | $13,156 | $11,709 | n/a |
OK1138 # 07 Y:2025 | 07 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,338 | $893 | n/a |
OK1138 # 06 Y:2025 | 06 | 2025 | INSULATE BARE EQUIPMENT | $488 | $653 | n/a |
OK1138 # 04 Y:2025 | 04 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,934 | $20 | n/a |
OK1138 # 05 Y:2025 | 05 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $41,839 | $132,837 | n/a |
OK1138 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,561 | $1,950 | n/a |
OK1138 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,811 | $2,884 | n/a |
OK1138 # 01 Y:2025 | 01 | 2025 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,449 | $0 | n/a |
OK1124 # 07 Y:2024 | 07 | 2024 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $124,468 | $710,360 | Not Implemented |
OK1124 # 03 Y:2024 | 03 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $28,751 | $511,000 | Not Implemented |
OK1124 # 01 Y:2024 | 01 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,690 | $117,898 | Not Implemented |
OK1124 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,625 | $8,880 | Not Implemented |
OK1124 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,780 | $520 | Not Implemented |
OK1124 # 05 Y:2024 | 05 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $405 | $403 | Not Implemented |
OK1124 # 06 Y:2024 | 06 | 2024 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $25,553 | $5,538 | Not Implemented |
OK1112 # 06 Y:2024 | 06 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $681 | $100 | Not Implemented |