Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
275
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0336 # 10 Y:2025 | 10 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $507 | $100 | n/a |
TT0336 # 06 Y:2025 | 06 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,830 | $500 | n/a |
TT0336 # 11 Y:2025 | 11 | 2025 | INSTALL OCCUPANCY SENSORS | $355 | $1,600 | n/a |
TT0336 # 09 Y:2025 | 09 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $551 | $375 | n/a |
TT0336 # 12 Y:2025 | 12 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $153 | $255 | n/a |
TT0336 # 03 Y:2025 | 03 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,640 | $6,680 | n/a |
TT0336 # 07 Y:2025 | 07 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,078 | $400 | n/a |
TT0336 # 05 Y:2025 | 05 | 2025 | OPTIMIZE PLANT POWER FACTOR | $2,201 | $5,250 | n/a |
TT0336 # 04 Y:2025 | 04 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $6,724 | $40,000 | n/a |
TT0336 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $19,703 | $159,000 | n/a |
TT0336 # 01 Y:2025 | 01 | 2025 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $21,145 | $30,000 | n/a |
TT0336 # 08 Y:2025 | 08 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $572 | $60 | n/a |
TT0335 # 01 Y:2025 | 01 | 2025 | USE POWER DURING OFF-PEAK PERIODS | $1,852 | $60 | n/a |
TT0335 # 07 Y:2025 | 07 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,933 | $9,000 | n/a |
TT0335 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $11,177 | $11,250 | n/a |
TT0335 # 02 Y:2025 | 02 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $78,715 | $15,000 | n/a |
TT0335 # 04 Y:2025 | 04 | 2025 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $263,515 | $80,000 | n/a |
TT0335 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,543 | $4,000 | n/a |
TT0335 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,409 | $1,885 | n/a |
TT0335 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $36,172 | $520,500 | n/a |
TT0343 # 08 Y:2025 | 08 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $293 | $170 | n/a |
TT0343 # 01 Y:2025 | 01 | 2025 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $106,940 | $8,000 | n/a |
TT0343 # 02 Y:2025 | 02 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $51,928 | $289,763 | n/a |
TT0343 # 04 Y:2025 | 04 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,788 | $4,000 | n/a |
TT0343 # 03 Y:2025 | 03 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,284 | $4,000 | n/a |