Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
11,109
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0336 # 04 Y:2025 | 04 | 2025 | BURN A LESS EXPENSIVE GRADE OF FUEL | $6,724 | $40,000 | n/a |
TT0336 # 03 Y:2025 | 03 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $13,640 | $6,680 | n/a |
TT0336 # 02 Y:2025 | 02 | 2025 | USE BATTERY STORAGE FOR DEMAND CONTROL | $19,703 | $159,000 | n/a |
TT0336 # 01 Y:2025 | 01 | 2025 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $21,145 | $30,000 | n/a |
MU0073 # 07 Y:2025 | 07 | 2025 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,669 | $2,444 | n/a |
MU0073 # 06 Y:2025 | 06 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22 | $118 | n/a |
MU0073 # 05 Y:2025 | 05 | 2025 | USE PHOTOCELL CONTROLS | $50 | $107 | n/a |
MU0073 # 04 Y:2025 | 04 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,348 | $296 | n/a |
MU0073 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $39 | $120 | n/a |
MU0073 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,226 | $0 | n/a |
MU0073 # 01 Y:2025 | 01 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $9,175 | $8,435 | n/a |
UD1117 # 01 Y:2025 | 01 | 2025 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,656 | $1,015 | n/a |
UD1117 # 02 Y:2025 | 02 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,150 | $0 | n/a |
UD1117 # 03 Y:2025 | 03 | 2025 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $2,839 | $947 | n/a |
UD1117 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $13,183 | $15,550 | n/a |
UD1117 # 05 Y:2025 | 05 | 2025 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $8,113 | $0 | n/a |
UD1117 # 06 Y:2025 | 06 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,029 | $4,975 | n/a |
TT0335 # 01 Y:2025 | 01 | 2025 | USE POWER DURING OFF-PEAK PERIODS | $1,852 | $60 | n/a |
TT0335 # 02 Y:2025 | 02 | 2025 | INITIATE A PROGRAM TO ACQUIRE ISO CERTIFICATION | $78,715 | $15,000 | n/a |
TT0335 # 03 Y:2025 | 03 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,409 | $1,885 | n/a |
TT0335 # 04 Y:2025 | 04 | 2025 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $263,515 | $80,000 | n/a |
TT0335 # 05 Y:2025 | 05 | 2025 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,543 | $4,000 | n/a |
TT0335 # 06 Y:2025 | 06 | 2025 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $11,177 | $11,250 | n/a |
TT0335 # 07 Y:2025 | 07 | 2025 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,933 | $9,000 | n/a |
TT0335 # 08 Y:2025 | 08 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $36,172 | $520,500 | n/a |