Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
10,517
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW0009 # 06 Y:2007 | 06 | 2007 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,114 | $3,000 | Not Implemented |
UW0009 # 07 Y:2007 | 07 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $3,371 | $1,984 | Implemented |
MA0625 # 01 Y:2007 | 01 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,463 | $31,000 | Not Implemented |
MA0625 # 02 Y:2007 | 02 | 2007 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $8,935 | $8,000 | Implemented |
MA0625 # 03 Y:2007 | 03 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,861 | $14,400 | Not Implemented |
MA0625 # 04 Y:2007 | 04 | 2007 | TURN OFF EQUIPMENT WHEN NOT IN USE | $5,881 | $0 | Not Implemented |
MA0625 # 05 Y:2007 | 05 | 2007 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,964 | $10,530 | Implemented |
OR0523 # 01 Y:2007 | 01 | 2007 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $35,000 | $60,000 | Implemented |
OR0523 # 02 Y:2007 | 02 | 2007 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $77,000 | $5,000 | Not Implemented |
OR0523 # 03 Y:2007 | 03 | 2007 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $1,350,000 | $32,700 | Not Implemented |
OR0523 # 04 Y:2007 | 04 | 2007 | INSULATE BARE EQUIPMENT | $1,220 | $1,160 | Implemented |
OR0523 # 05 Y:2007 | 05 | 2007 | COVER OPEN TANKS | $3,000 | $9,000 | Not Implemented |
UD0770 # 01 Y:2007 | 01 | 2007 | ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF | $309,378 | $0 | Implemented |
UD0770 # 02 Y:2007 | 02 | 2007 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $47,879 | $52,520 | Implemented |
UD0770 # 03 Y:2007 | 03 | 2007 | INSTALL TIMERS AND/OR THERMOSTATS | $40,049 | $2,700 | Implemented |
UD0770 # 04 Y:2007 | 04 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $36,512 | $2,280 | Implemented |
UD0770 # 05 Y:2007 | 05 | 2007 | OPTIMIZE PLANT POWER FACTOR | $14,976 | $120,000 | Not Implemented |
UD0770 # 06 Y:2007 | 06 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,018 | $40,083 | Not Implemented |
UD0770 # 07 Y:2007 | 07 | 2007 | INSTALL SKYLIGHTS | $8,153 | $30,000 | Implemented |
UD0770 # 08 Y:2007 | 08 | 2007 | DEVELOP A REPAIR/REPLACE POLICY | $7,672 | $42,117 | Implemented |
UD0770 # 09 Y:2007 | 09 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,139 | $300 | Implemented |
UD0770 # 10 Y:2007 | 10 | 2007 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,532 | $0 | Implemented |
UD0770 # 11 Y:2007 | 11 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $448 | $5,050 | Implemented |
UM0333 # 01 Y:2007 | 01 | 2007 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $19,901 | $2,000 | Implemented |
UM0333 # 02 Y:2007 | 02 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,803 | $50,000 | Not Implemented |