IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

321

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0421 # 05 Y:2009 05 2009 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,680 $2,262 Not Implemented
UF0421 # 04 Y:2009 04 2009 INSTALL SKYLIGHTS $1,691 $11,790 Not Implemented
UF0421 # 03 Y:2009 03 2009 INSTALL COMMON HEADER ON COMPRESSORS $2,293 $0 Implemented
UF0421 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $31,204 $62,181 Not Implemented
UF0421 # 01 Y:2009 01 2009 INSTALL OCCUPANCY SENSORS $4,519 $1,280 Not Implemented
MI0174 # 01 Y:2008 01 2008 UTILIZE A LESS EXPENSIVE COOLING METHOD $214,998 $360,000 Not Implemented
MI0174 # 02 Y:2008 02 2008 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $32,694 $2,000 Implemented
MI0174 # 03 Y:2008 03 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21,544 $40 Implemented
MI0174 # 04 Y:2008 04 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,041 $1,210 Implemented
MI0174 # 05 Y:2008 05 2008 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $10,087 $13,200 Not Implemented
MI0174 # 06 Y:2008 06 2008 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,075 $322 Implemented
UF0386 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,441 $4,440 Not Implemented
UF0386 # 02 Y:2006 02 2006 ADD AREA LIGHTING SWITCHES $5,721 $13,094 Not Implemented
UF0386 # 03 Y:2006 03 2006 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,878 $0 Not Implemented
UF0386 # 04 Y:2006 04 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,880 $56 Not Implemented
UF0386 # 05 Y:2006 05 2006 INSTALL OCCUPANCY SENSORS $1,101 $1,703 Not Implemented
UF0386 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,727 $1,457 Not Implemented
UF0386 # 07 Y:2006 07 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $811 $0 Not Implemented
UF0386 # 08 Y:2006 08 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $711 $0 Not Implemented
UF0386 # 09 Y:2006 09 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $212 $0 Not Implemented
UF0386 # 10 Y:2006 10 2006 LOWER CEILING TO REDUCE CONDITIONED SPACE $4,883 $846 Not Implemented
UF0386 # 11 Y:2006 11 2006 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,887 $24,500 Not Implemented
MI0131 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $42,001 $40,224 Implemented
MI0131 # 02 Y:2006 02 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $41,642 $6,538 Implemented
MI0131 # 03 Y:2006 03 2006 $16,391 $29,320 Implemented