IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

391

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MU0066 # 05 Y:2025 05 2025 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $189 $627 n/a
MU0066 # 04 Y:2025 04 2025 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $49,773 $560,225 n/a
MU0066 # 03 Y:2025 03 2025 USE PHOTOCELL CONTROLS $302 $550 n/a
MU0066 # 09 Y:2025 09 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $59,971 $561,792 n/a
MU0066 # 01 Y:2025 01 2025 TURN OFF EQUIPMENT WHEN NOT IN USE $226 $0 n/a
MU0066 # 02 Y:2025 02 2025 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $762 $362 n/a
MU0066 # 07 Y:2025 07 2025 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $251 $242 n/a
MU0066 # 06 Y:2025 06 2025 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,303 $4,440 n/a
MU0066 # 08 Y:2025 08 2025 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $116 $193 n/a
MU0054 # 06 Y:2024 06 2024 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $118 $272 n/a
MU0054 # 05 Y:2024 05 2024 INSTALL OCCUPANCY SENSORS $1,296 $0 n/a
MU0054 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,402 $28,100 n/a
MU0054 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,874 $0 n/a
MU0054 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,876 $1,801 n/a
MU0054 # 01 Y:2024 01 2024 USE OPTIMUM TEMPERATURE $6,955 $0 n/a
MU0054 # 07 Y:2024 07 2024 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $349 $0 n/a
MU0049 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $7 $24 Not Implemented
MU0049 # 05 Y:2024 05 2024 USE PHOTOCELL CONTROLS $191 $248 Not Implemented
MU0049 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $236 $62 Not Implemented
MU0049 # 07 Y:2024 07 2024 INSTALL TIMERS AND/OR THERMOSTATS $625 $600 Not Implemented
MU0049 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,133 $0 Not Implemented
MU0049 # 04 Y:2024 04 2024 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $49 $0 Not Implemented
MU0049 # 02 Y:2024 02 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $717 $700 Not Implemented
MU0049 # 08 Y:2024 08 2024 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $251 $144 Not Implemented
MU0030 # 02 Y:2023 02 2023 USE PHOTOCELL CONTROLS $110 $495 Implemented