Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
24
matching recommendationsNAICS | 332 | Fabricated Metal Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0533 # 06 Y:2022 | 06 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,903 | $6,154 | Not Implemented |
LE0533 # 05 Y:2022 | 05 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $5,998 | $18,621 | Not Implemented |
LE0533 # 04 Y:2022 | 04 | 2022 | BURN A LESS EXPENSIVE GRADE OF FUEL | $24,359 | $62,500 | Not Implemented |
LE0533 # 03 Y:2022 | 03 | 2022 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $21,231 | $50,000 | Not Implemented |
LE0533 # 02 Y:2022 | 02 | 2022 | USE RADIANT HEATER FOR SPOT HEATING | $3,206 | $3,500 | Not Implemented |
LE0533 # 01 Y:2022 | 01 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,161 | $4,100 | Not Implemented |
CW0123 # 02 Y:2022 | 02 | 2022 | USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE | $1,422 | $4,000 | n/a |
CW0123 # 10 Y:2022 | 10 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $1,949 | $0 | n/a |
CW0123 # 09 Y:2022 | 09 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,158 | $12,694 | n/a |
CW0123 # 08 Y:2022 | 08 | 2022 | RELOCATE OVEN / FURNACE TO MORE EFFICIENT LOCATION | $7,698 | $5,000 | n/a |
CW0123 # 07 Y:2022 | 07 | 2022 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $30,793 | $45,000 | n/a |
CW0123 # 06 Y:2022 | 06 | 2022 | SCHEDULE BAKING TIMES OF SMALL AND LARGE COMPONENTS | $2,357 | $0 | n/a |
CW0123 # 05 Y:2022 | 05 | 2022 | USE OPTIMUM TEMPERATURE | $4,521 | $3,500 | n/a |
CW0123 # 04 Y:2022 | 04 | 2022 | IMPROVE LUBRICATION PRACTICES | $27,999 | $8,008 | n/a |
CW0123 # 03 Y:2022 | 03 | 2022 | REPLACE HEXAVALENT CHROMIUM SOLUTIONS WITH TRIVALENT SOLUTIONS | $30,091 | $55,770 | n/a |
CW0123 # 01 Y:2022 | 01 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $518 | $105 | n/a |
LE0521 # 01 Y:2022 | 01 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $14,738 | $0 | Implemented |
LE0521 # 02 Y:2022 | 02 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $777 | $35 | Implemented |
LE0521 # 03 Y:2022 | 03 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,021 | $800 | Not Implemented |
LE0521 # 04 Y:2022 | 04 | 2022 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,127 | $1,200 | Implemented |
LE0521 # 05 Y:2022 | 05 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,148 | $2,956 | Not Implemented |
LE0521 # 06 Y:2022 | 06 | 2022 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $410 | $1,200 | Implemented |
LE0521 # 07 Y:2022 | 07 | 2022 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,237 | $11,000 | Not Implemented |
LE0521 # 08 Y:2022 | 08 | 2022 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $27,881 | $128,814 | Implemented |