IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27

matching recommendations
Reset
NAICS 332119 Metal Crown, Closure, and Other Metal Stamping (except Automotive)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0537 # 08 Y:2023 08 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $57,920 $245,000 Implemented
LE0537 # 07 Y:2023 07 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,096 $67,533 Implemented
LE0537 # 03 Y:2023 03 2023 INSTALL TIMERS AND/OR THERMOSTATS $825 $570 Implemented
LE0537 # 01 Y:2023 01 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $167,234 $0 Implemented
LE0509 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,834 $2,500 Implemented
LE0509 # 03 Y:2021 03 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,755 $56,400 Implemented
LE0509 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,037 $8,000 Implemented
LE0509 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,633 $9,000 Implemented
LE0456 # 01 Y:2018 01 2018 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $7,810 $36 Implemented
LE0456 # 03 Y:2018 03 2018 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,140 $3,500 Implemented
LE0456 # 04 Y:2018 04 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $14,979 $50,000 Implemented
LE0456 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $783 $3,200 Implemented
LE0456 # 06 Y:2018 06 2018 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,041 $40,000 Implemented
LE0436 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,929 $15,805 Implemented
LE0436 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $513 $1,683 Implemented
LE0436 # 04 Y:2017 04 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,174 $3,600 Implemented
LE0436 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,786 $1,000 Implemented
WV0355 # 03 Y:2007 03 2007 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $63,700 $65,000 Implemented
WV0355 # 05 Y:2007 05 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $24,887 $25,000 Implemented
WV0355 # 06 Y:2007 06 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $17,682 $6,140 Implemented
WV0355 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,654 $39,137 Implemented
WV0355 # 09 Y:2007 09 2007 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $9,370 $5,220 Implemented
WV0355 # 10 Y:2007 10 2007 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,946 $4,000 Implemented
WV0355 # 13 Y:2007 13 2007 DEVELOP A REPAIR/REPLACE POLICY $5,152 $1,973 Implemented
WV0355 # 15 Y:2007 15 2007 INSTALL OCCUPANCY SENSORS $2,673 $2,890 Implemented