IAC logo
IAC Assessment: WV0355
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WV0355
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center West Virginia University
Assessment Year 2007
Principal Product crowns and closures
NAICS 332119 - Metal Crown, Closure, and Other Metal Stamping (except Automotive)
SIC 3466 - Crowns And Closures
Sales $50,000,000-$100,000,000
# of Employees 132
Plant Area (Sq.Ft.) 276,021
Annual Production 330,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) PA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $372,760 15,234,666 kWh $0.02
Electricity Demand $278,805 32,420 kW-months/year $8.60
Electricity Fees $9,622 - $ -
Natural Gas $1,299,006 97,768 MMBtu $13.29
TOTAL ENERGY COSTS $1,960,193
RECOMMENDED SAVINGS* $519,944 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $151,662
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$187,442
Cost:
$70,000
- - - - $187,442 14,104 - - - - -
-
kWh
-
-
kW-months/year
$187,442
14,104
MMBtu
-
-
$
-
-
$
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$99,024
Cost:
$30,573
- - - - $99,024 7,451 - - - - -
-
kWh
-
-
kW-months/year
$99,024
7,451
MMBtu
-
-
$
-
-
$
03: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$63,700
Cost:
$65,000
- - - - $63,805 4,801 $(-105) - - - -
-
kWh
-
-
kW-months/year
$63,805
4,801
MMBtu
$(-105)
-
$
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$47,113
Cost:
$11,460
- - - - $47,113 3,545 - - - - -
-
kWh
-
-
kW-months/year
$47,113
3,545
MMBtu
-
-
$
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$24,887
Cost:
$25,000
$17,130 700,058 $7,757 902 - - - - - - $17,130
700,058
kWh
$7,757
902
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$17,682
Cost:
$6,140
$13,272 542,387 $8,970 1,043 - - $(-560) - $(-4,000) - $13,272
542,387
kWh
$8,970
1,043
kW-months/year
-
-
MMBtu
$(-560)
-
$
$(-4,000)
-
$
07: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$17,171
Cost:
$10,940
- - - - $17,171 1,292 - - - - -
-
kWh
-
-
kW-months/year
$17,171
1,292
MMBtu
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$14,654
Cost:
$39,137
$9,649 394,311 $5,005 582 - - - - - - $9,649
394,311
kWh
$5,005
582
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$9,370
Cost:
$5,220
$6,446 263,525 $2,924 340 - - - - - - $6,446
263,525
kWh
$2,924
340
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$8,946
Cost:
$4,000
- - - - $9,051 681 $(-105) - - - -
-
kWh
-
-
kW-months/year
$9,051
681
MMBtu
$(-105)
-
$
-
-
$
11: 2.4157 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM Savings:
$7,728
Cost:
$3,500
$4,987 203,838 $3,371 392 - - $(-630) - - - $4,987
203,838
kWh
$3,371
392
kW-months/year
-
-
MMBtu
$(-630)
-
$
-
-
$
12: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$5,378
Cost:
$2,150
$3,211 131,241 $2,167 252 - - - - - - $3,211
131,241
kWh
$2,167
252
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
13: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$5,152
Cost:
$1,973
$3,325 135,891 $2,247 261 - - $(-420) - - - $3,325
135,891
kWh
$2,247
261
kW-months/year
-
-
MMBtu
$(-420)
-
$
-
-
$
14: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$4,426
Cost:
$3,700
- - - - $4,426 333 - - - - -
-
kWh
-
-
kW-months/year
$4,426
333
MMBtu
-
-
$
-
-
$
15: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,673
Cost:
$2,890
$2,673 109,250 - - - - - - - - $2,673
109,250
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
16: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,450
Cost:
-
$1,461 59,704 $989 115 - - - - - - $1,461
59,704
kWh
$989
115
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
17: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,148
Cost:
$2,700
$1,477 60,283 $671 78 - - - - - - $1,477
60,283
kWh
$671
78
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$519,944
Cost:
$284,383
$63,631 2,600,488 $34,101 3,965 $428,032 32,207 $(-1,820) - $(-4,000) - $63,631
2,600,488
kWh
$34,101
3,965
kW-months/year
$428,032
32,207
MMBtu
$(-1,820)
-
$
$(-4,000)
-
$
TOTAL IMPLEMENTED Savings:
$151,662
Cost:
$152,060
$55,433 2,265,409 $28,563 3,321 $72,856 5,482 $(-1,190) - $(-4,000) - $55,433
2,265,409
kWh
$28,563
3,321
kW-months/year
$72,856
5,482
MMBtu
$(-1,190)
-
$
$(-4,000)
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes Ancillary Material Cost