IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

370

matching recommendations
Reset
NAICS 33221 Cutlery and Handtool Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0551 # 05 Y:2016 05 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $854 $70 Implemented
IA0551 # 06 Y:2016 06 2016 INSTALL OCCUPANCY SENSORS $527 $2,380 Not Implemented
MZ0205 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $969 $400 Implemented
MZ0205 # 04 Y:2015 04 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $397 $0 Implemented
MZ0205 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,581 $850 Implemented
MZ0205 # 02 Y:2015 02 2015 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,559 $0 Implemented
MZ0205 # 01 Y:2015 01 2015 INSULATE BARE EQUIPMENT $771 $1,050 Not Implemented
TT0163 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $423 $1,500 Implemented
TT0163 # 06 Y:2015 06 2015 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,532 $3,013 Implemented
TT0163 # 05 Y:2015 05 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,611 $3,000 Implemented
TT0163 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,251 $75 Implemented
TT0163 # 03 Y:2015 03 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $2,380 $1,075 Implemented
TT0163 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $4,100 $4,110 Implemented
TT0163 # 01 Y:2015 01 2015 RECOVER WASTE HEAT FROM EQUIPMENT $4,742 $5,000 Not Implemented
OK0922 # 09 Y:2015 09 2015 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $656 $690 Not Implemented
OK0922 # 08 Y:2015 08 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,542 $780 Not Implemented
OK0922 # 07 Y:2015 07 2015 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $2,660 $720 Implemented
OK0922 # 06 Y:2015 06 2015 UTILIZE A LESS EXPENSIVE COOLING METHOD $10,800 $22,080 Not Implemented
OK0922 # 05 Y:2015 05 2015 USE RADIANT HEATER FOR SPOT HEATING $2,132 $6,660 Not Implemented
OK0922 # 04 Y:2015 04 2015 OPTIMIZE PLANT POWER FACTOR $37,221 $46,451 Not Implemented
OK0922 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,204 $77,600 Implemented
OK0922 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,502 $30,324 Implemented
OK0922 # 01 Y:2015 01 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $950 $580 Not Implemented
MA0733 # 08 Y:2014 08 2014 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $194 $500 Not Implemented
MA0733 # 07 Y:2014 07 2014 INSTALL / REPAIR INSULATION ON STEAM LINES $906 $1,800 Implemented