Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,225
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1137 # 07 Y:2025 | 07 | 2025 | COMBINE UTILITY METERS | $682 | $80 | n/a |
OK1137 # 01 Y:2025 | 01 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $641 | $985 | n/a |
OK1137 # 10 Y:2025 | 10 | 2025 | CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS | $1,857 | $3,900 | n/a |
OK1137 # 09 Y:2025 | 09 | 2025 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,109 | $2,120 | n/a |
OK1137 # 06 Y:2025 | 06 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,920 | $6,940 | n/a |
OK1137 # 02 Y:2025 | 02 | 2025 | INSTALL OCCUPANCY SENSORS | $520 | $1,286 | n/a |
OK1137 # 05 Y:2025 | 05 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,886 | $1,320 | n/a |
OK1137 # 03 Y:2025 | 03 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,249 | $160,056 | n/a |
OK1137 # 08 Y:2025 | 08 | 2025 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $558 | $410 | n/a |
OK1137 # 04 Y:2025 | 04 | 2025 | OPTIMIZE PLANT POWER FACTOR | $3,482 | $12,000 | n/a |
UA0294 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $14,895 | $2,777 | n/a |
UA0294 # 01 Y:2025 | 01 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $232 | $250 | n/a |
UA0294 # 03 Y:2025 | 03 | 2025 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $916 | $1,133 | n/a |
UA0294 # 05 Y:2025 | 05 | 2025 | INSTALL OCCUPANCY SENSORS | $2,012 | $2,261 | n/a |
UA0294 # 02 Y:2025 | 02 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $813 | $1,572 | n/a |
UA0294 # 06 Y:2025 | 06 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $46,922 | $377,678 | n/a |
UA0294 # 04 Y:2025 | 04 | 2025 | INSTALL TIMERS AND/OR THERMOSTATS | $5,323 | $29 | n/a |
UU0266 # 02 Y:2025 | 02 | 2025 | USE RADIANT HEATER FOR SPOT HEATING | $8,217 | $13,000 | n/a |
UU0266 # 04 Y:2025 | 04 | 2025 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $15,500 | $38,200 | n/a |
UU0266 # 05 Y:2025 | 05 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,730 | $6,960 | n/a |
UU0266 # 03 Y:2025 | 03 | 2025 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $52,801 | $18,500 | n/a |
UU0266 # 06 Y:2025 | 06 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $633 | $543 | n/a |
UU0266 # 01 Y:2025 | 01 | 2025 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $15,681 | $22,500 | n/a |
UU0266 # 07 Y:2025 | 07 | 2025 | OPTIMIZE PLANT POWER FACTOR | $8,550 | $22,000 | n/a |
TT0324 # 07 Y:2025 | 07 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $3,929 | $13,000 | n/a |