IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,171

matching recommendations
Reset
NAICS 3323 Architectural and Structural Metals Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UC2412 # 04 Y:2024 04 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,533 $75 n/a
UC2412 # 01 Y:2024 01 2024 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $680 $0 n/a
UC2412 # 07 Y:2024 07 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,217 $900 n/a
UC2412 # 02 Y:2024 02 2024 PAY UTILITY BILLS ON TIME $247 $0 n/a
UC2412 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,630 $1,300 n/a
UC2412 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $16,427 $124,645 n/a
UC2412 # 03 Y:2024 03 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,358 $0 n/a
UC2412 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $511 $225 n/a
WV0666 # 06 Y:2024 06 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $84 $100 n/a
WV0666 # 01 Y:2024 01 2024 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,346 $19,500 n/a
WV0666 # 04 Y:2024 04 2024 DEVELOP A REPAIR/REPLACE POLICY $445 $1,367 n/a
WV0666 # 02 Y:2024 02 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,679 $5,920 n/a
WV0666 # 03 Y:2024 03 2024 UPGRADE CONTROLS ON COMPRESSORS $859 $3,565 n/a
WV0666 # 05 Y:2024 05 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $260 $640 n/a
SU0555 # 14 Y:2024 14 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,140 $35,125 n/a
SU0555 # 02 Y:2024 02 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,613 $0 n/a
SU0555 # 05 Y:2024 05 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,994 $104 n/a
SU0555 # 07 Y:2024 07 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $362 $128 n/a
SU0555 # 10 Y:2024 10 2024 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,795 $1,172 n/a
SU0555 # 12 Y:2024 12 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $61,520 $301,550 n/a
SU0555 # 04 Y:2024 04 2024 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,049 $70 n/a
SU0555 # 01 Y:2024 01 2024 PAY BILLS ON TIME TO AVOID LATE FEES $923 $0 n/a
SU0555 # 13 Y:2024 13 2024 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $101 $498 n/a
SU0555 # 11 Y:2024 11 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $823 $1,347 n/a
SU0555 # 08 Y:2024 08 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $600 $292 n/a