Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,176
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0568 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $659 | $2,850 | Not Implemented |
SD0568 # 05 Y:2018 | 05 | 2018 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $475 | $2,150 | Not Implemented |
MI0335 # 01 Y:2018 | 01 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $4,545 | $3,280 | Implemented |
MI0335 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,167 | $8,063 | Implemented |
MI0335 # 03 Y:2018 | 03 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,894 | $2,030 | Implemented |
MI0335 # 04 Y:2018 | 04 | 2018 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,798 | $7,385 | Implemented |
MI0335 # 05 Y:2018 | 05 | 2018 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $1,932 | $7,536 | Implemented |
MI0335 # 06 Y:2018 | 06 | 2018 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $1,505 | $480 | Implemented |
MI0335 # 07 Y:2018 | 07 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,235 | $2,520 | Implemented |
MI0335 # 08 Y:2018 | 08 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,157 | $5,370 | Implemented |
AM0756 # 01 Y:2018 | 01 | 2018 | OPTIMIZE PLANT POWER FACTOR | $7,920 | $17,500 | Not Implemented |
AM0756 # 02 Y:2018 | 02 | 2018 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $46,750 | $5,000 | Not Implemented |
AM0756 # 03 Y:2018 | 03 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $37,900 | $117,500 | Not Implemented |
AM0756 # 04 Y:2018 | 04 | 2018 | USE SYNTHETIC LUBRICANT | $4,285 | $300 | Implemented |
AM0756 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,630 | $300 | Not Implemented |
AM0756 # 06 Y:2018 | 06 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,410 | $12,110 | Not Implemented |
AM0756 # 07 Y:2018 | 07 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $245 | $8 | Not Implemented |
AM0756 # 08 Y:2018 | 08 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $280 | $300 | Not Implemented |
MZ0251 # 01 Y:2018 | 01 | 2018 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $22,536 | $32,400 | Not Implemented |
MZ0251 # 02 Y:2018 | 02 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $688 | $75 | Implemented |
MZ0251 # 03 Y:2018 | 03 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $862 | $1,160 | Implemented |
MZ0251 # 04 Y:2018 | 04 | 2018 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $6,719 | $36,000 | Not Implemented |
MZ0251 # 05 Y:2018 | 05 | 2018 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,018 | $0 | Implemented |
MZ0251 # 06 Y:2018 | 06 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,153 | $6,140 | Implemented |
MZ0249 # 01 Y:2018 | 01 | 2018 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $607 | $1,750 | Implemented |