IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,176

matching recommendations
Reset
NAICS 3323 Architectural and Structural Metals Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0568 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $659 $2,850 Not Implemented
SD0568 # 05 Y:2018 05 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $475 $2,150 Not Implemented
MI0335 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $4,545 $3,280 Implemented
MI0335 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,167 $8,063 Implemented
MI0335 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,894 $2,030 Implemented
MI0335 # 04 Y:2018 04 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,798 $7,385 Implemented
MI0335 # 05 Y:2018 05 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,932 $7,536 Implemented
MI0335 # 06 Y:2018 06 2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1,505 $480 Implemented
MI0335 # 07 Y:2018 07 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,235 $2,520 Implemented
MI0335 # 08 Y:2018 08 2018 RECOVER WASTE HEAT FROM EQUIPMENT $1,157 $5,370 Implemented
AM0756 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $7,920 $17,500 Not Implemented
AM0756 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $46,750 $5,000 Not Implemented
AM0756 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,900 $117,500 Not Implemented
AM0756 # 04 Y:2018 04 2018 USE SYNTHETIC LUBRICANT $4,285 $300 Implemented
AM0756 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,630 $300 Not Implemented
AM0756 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,410 $12,110 Not Implemented
AM0756 # 07 Y:2018 07 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $245 $8 Not Implemented
AM0756 # 08 Y:2018 08 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $280 $300 Not Implemented
MZ0251 # 01 Y:2018 01 2018 RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER $22,536 $32,400 Not Implemented
MZ0251 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $688 $75 Implemented
MZ0251 # 03 Y:2018 03 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $862 $1,160 Implemented
MZ0251 # 04 Y:2018 04 2018 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $6,719 $36,000 Not Implemented
MZ0251 # 05 Y:2018 05 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,018 $0 Implemented
MZ0251 # 06 Y:2018 06 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $10,153 $6,140 Implemented
MZ0249 # 01 Y:2018 01 2018 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $607 $1,750 Implemented