IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,176

matching recommendations
Reset
NAICS 3323 Architectural and Structural Metals Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0815 # 02 Y:2010 02 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $103 $0 Implemented
UD0815 # 03 Y:2010 03 2010 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $243 $507 Implemented
UD0815 # 04 Y:2010 04 2010 INSTALL SPECTRAL REFLECTORS / DELAMP $423 $200 Not Implemented
UD0815 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,129 $2,452 Not Implemented
UD0815 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $660 $763 Not Implemented
UD0815 # 07 Y:2010 07 2010 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $344 $1,572 Not Implemented
UD0815 # 08 Y:2010 08 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $88 $0 Implemented
UD0815 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $21 $0 Implemented
UD0815 # 10 Y:2010 10 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $238 $0 Not Implemented
UD0815 # 11 Y:2010 11 2010 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $4,159 $1,678 Not Implemented
UD0815 # 12 Y:2010 12 2010 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $190 $300 Not Implemented
UD0815 # 13 Y:2010 13 2010 INSTALL REPLACEMENT DOORS $6,124 $50,000 Not Implemented
UD0812 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,236 $19,740 Not Implemented
UD0812 # 02 Y:2010 02 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,893 $6,240 Not Implemented
UD0812 # 03 Y:2010 03 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,148 $0 Not Implemented
UD0812 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,589 $1,000 Not Implemented
UD0812 # 05 Y:2010 05 2010 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $2,047 $12,500 Not Implemented
UD0812 # 06 Y:2010 06 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,040 $16,000 Not Implemented
UD0812 # 07 Y:2010 07 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,750 $21,000 Not Implemented
UD0812 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $2,335 $2,310 Not Implemented
UD0812 # 09 Y:2010 09 2010 COVER OPEN TANKS $4,280 $3,600 Not Implemented
UD0812 # 10 Y:2010 10 2010 OPTIMIZE PLANT POWER FACTOR $1,963 $5,000 Not Implemented
UD0812 # 11 Y:2010 11 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $800 $2,500 Not Implemented
UD0812 # 12 Y:2010 12 2010 INSTALL AUTOMATIC STACK DAMPER $20,826 $200 Not Implemented
UD0812 # 13 Y:2010 13 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,114 $70,000 Not Implemented