Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,171
matching recommendationsNAICS | 3323 | Architectural and Structural Metals Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BD0297 # 01 Y:2006 | 01 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $18,063 | $50,400 | Not Implemented |
BD0297 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,422 | $1,200 | Implemented |
BD0297 # 03 Y:2006 | 03 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,740 | $2,500 | Implemented |
BD0297 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,600 | $600 | Implemented |
BD0297 # 05 Y:2006 | 05 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,324 | $6,150 | Implemented |
BD0297 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $823 | $2,975 | Implemented |
BD0297 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $812 | $1,625 | Implemented |
BD0297 # 08 Y:2006 | 08 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $688 | $0 | Implemented |
BD0297 # 09 Y:2006 | 09 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $455 | $600 | Implemented |
BD0297 # 10 Y:2006 | 10 | 2006 | INSTALL OCCUPANCY SENSORS | $422 | $600 | Implemented |
BD0297 # 11 Y:2006 | 11 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $235 | $140 | Implemented |
BD0297 # 12 Y:2006 | 12 | 2006 | RECOVER AND REUSE COOLING WATER | $42,543 | $36,180 | Implemented |
BD0297 # 13 Y:2006 | 13 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $58,145 | $9,400 | Implemented |
BD0298 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,476 | $1,014 | Implemented |
BD0298 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $988 | $140 | Implemented |
BD0298 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $902 | $0 | Not Implemented |
BD0298 # 04 Y:2006 | 04 | 2006 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $436 | $1,200 | Implemented |
BD0298 # 05 Y:2006 | 05 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $350 | $350 | Implemented |
BD0298 # 06 Y:2006 | 06 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $202 | $370 | Not Implemented |
BD0298 # 07 Y:2006 | 07 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $169 | $300 | Implemented |
MS0286 # 01 Y:2005 | 01 | 2005 | AIR CONDITION ONLY SPACE NECESSARY | $6,625 | $0 | Not Implemented |
UU0096 # 01 Y:2005 | 01 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $840 | $330 | Not Implemented |
UU0096 # 02 Y:2005 | 02 | 2005 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,320 | $5,000 | Not Implemented |
UU0096 # 03 Y:2005 | 03 | 2005 | USE PHOTOCELL CONTROLS | $2,530 | $2,040 | Not Implemented |
UU0096 # 04 Y:2005 | 04 | 2005 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,320 | $1,950 | Not Implemented |