IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
NAICS 3323 Architectural and Structural Metals Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0951 # 07 Y:2020 07 2020 RECOVER WASTE HEAT FROM EQUIPMENT $3,162 $4,561 Implemented
GT0951 # 05 Y:2020 05 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $54,280 $66,564 Implemented
GT0951 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,307 $2,255 Implemented
GT0951 # 01 Y:2020 01 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $79,957 $675 Implemented
GT0951 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $126,097 $4,500 Implemented
GT0917 # 02 Y:2018 02 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,834 $10,400 Implemented
GT0866 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,311 $800 Implemented
GT0866 # 03 Y:2009 03 2009 USE SYNTHETIC LUBRICANT $1,648 $0 Implemented
GT0866 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,625 $7,142 Implemented
GT0866 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,697 $2,084 Implemented
GT0839 # 05 Y:2007 05 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,582 $0 Implemented
GT0839 # 04 Y:2007 04 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,992 $1,000 Implemented
GT0839 # 02 Y:2007 02 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $22,858 $49,525 Implemented
GT0839 # 01 Y:2007 01 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,317 $5,346 Implemented
GT0826 # 01 Y:2006 01 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $8,555 $0 Implemented
GT0788 # 09 Y:2004 09 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $760 $1,200 Implemented
GT0788 # 08 Y:2004 08 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,396 $3,768 Implemented
GT0788 # 07 Y:2004 07 2004 INSULATE BARE EQUIPMENT $144 $1,100 Implemented
GT0788 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,890 $0 Implemented
GT0788 # 05 Y:2004 05 2004 AIR CONDITION ONLY SPACE NECESSARY $8,123 $3,450 Implemented
GT0788 # 01 Y:2004 01 2004 CHECK FOR ACCURACY OF UTILITY / POWER METERS $7,899 $0 Implemented