IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

32

matching recommendations
Reset
NAICS 33231 Plate Work and Fabricated Structural Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0379 # 02 Y:2009 02 2009 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $909 $0 Implemented
SF0379 # 03 Y:2009 03 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,136 $1,566 Not Implemented
SF0379 # 04 Y:2009 04 2009 USE PHOTOCELL CONTROLS $8,945 $5,833 Implemented
SF0379 # 05 Y:2009 05 2009 INSTALL OCCUPANCY SENSORS $3,347 $4,920 Implemented
SF0379 # 06 Y:2009 06 2009 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $803 $1,288 Implemented
SF0379 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,419 $28,144 Implemented
SF0379 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,329 $0 Implemented
UF0421 # 02 Y:2009 02 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $31,204 $62,181 Not Implemented
UF0421 # 01 Y:2009 01 2009 INSTALL OCCUPANCY SENSORS $4,519 $1,280 Not Implemented
UF0421 # 03 Y:2009 03 2009 INSTALL COMMON HEADER ON COMPRESSORS $2,293 $0 Implemented
UF0421 # 04 Y:2009 04 2009 INSTALL SKYLIGHTS $1,691 $11,790 Not Implemented
UF0421 # 05 Y:2009 05 2009 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $3,680 $2,262 Not Implemented
UF0421 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,375 $8,700 Not Implemented
UF0421 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,873 $515 Implemented
UF0421 # 08 Y:2009 08 2009 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $16,017 $0 Not Implemented
UF0421 # 09 Y:2009 09 2009 DEVELOP A REPAIR/REPLACE POLICY $2,717 $0 Not Implemented
DL0034 # 07 Y:2009 07 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $700 $0 Implemented
DL0034 # 08 Y:2009 08 2009 ADD AREA LIGHTING SWITCHES $313 $197 Implemented
DL0034 # 06 Y:2009 06 2009 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,735 $18,313 Implemented
DL0034 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,600 $4,000 Implemented
DL0034 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,489 $55,984 Implemented
DL0034 # 03 Y:2009 03 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,700 $4,440 Not Implemented
DL0034 # 02 Y:2009 02 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,702 $5,000 Not Implemented
DL0034 # 01 Y:2009 01 2009 INSTALL TIMERS AND/OR THERMOSTATS $5,400 $3,600 Not Implemented
BD0354 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,388 $80,292 Not Implemented