IAC Assessment: BD0354
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: BD0354
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Bradley University
Assessment Year 2009
Principal Product Fabricated OEM parts
NAICS 332313 - Plate Work Manufacturing
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 100,000
Annual Production 70,000 Pieces
Production Hrs. Annual 7,488
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $242,001 4,408,721 kWh $0.05
Electricity Demand $51,366 6,565 kW-months/year $7.82
Electricity Fees $88,049 - $ -
Natural Gas $153,466 16,879 MMBtu $9.09
TOTAL ENERGY COSTS $534,882
RECOMMENDED SAVINGS* $83,984 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,388
Cost:
$80,292
$19,214 1,025 $2,584 482 $(-3,410) - - - $19,214
1,025
kWh
$2,584
482
kW-months/year
$(-3,410)
-
$
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$767
Cost:
$1,100
$447 24 $52 10 $268 - - - $447
24
kWh
$52
10
kW-months/year
$268
-
$
-
-
MMBtu
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$685
Cost:
$1,816
$638 34 $27 5 $20 - - - $638
34
kWh
$27
5
kW-months/year
$20
-
$
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,005
Cost:
-
$5,230 279 $775 144 - - - - $5,230
279
kWh
$775
144
kW-months/year
-
-
$
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,270
Cost:
$1,500
$1,981 106 $289 54 - - - - $1,981
106
kWh
$289
54
kW-months/year
-
-
$
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,132
Cost:
$3,100
$13,155 701 $4,977 927 - - - - $13,155
701
kWh
$4,977
927
kW-months/year
-
-
$
-
-
MMBtu
07: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$13,322
Cost:
$2,000
$8,215 438 $414 77 - - $4,693 596 $8,215
438
kWh
$414
77
kW-months/year
-
-
$
$4,693
596
MMBtu
08: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$24,415
Cost:
-
$24,415 3,101 - - - - - - $24,415
3,101
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$83,984
Cost:
$89,808
$73,295 5,708 $9,118 1,699 $(-3,122) - $4,693 596 $73,295
5,708
kWh
$9,118
1,699
kW-months/year
$(-3,122)
-
$
$4,693
596
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas