Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
73
matching recommendationsNAICS | 33231 | Plate Work and Fabricated Structural Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0691 # 07 Y:2015 | 07 | 2015 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $120 | $130 | Not Implemented |
AM0691 # 06 Y:2015 | 06 | 2015 | USE PHOTOCELL CONTROLS | $280 | $130 | Implemented |
AM0691 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $420 | $240 | Not Implemented |
AM0691 # 04 Y:2015 | 04 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $440 | $0 | Implemented |
AM0691 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,250 | $1,720 | Not Implemented |
AM0691 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,140 | $39,720 | Not Implemented |
AM0691 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,550 | $2,000 | Implemented |
SU0395 # 03 Y:2015 | 03 | 2015 | IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS | $1,174 | $1,020 | Implemented |
SU0395 # 06 Y:2015 | 06 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,804 | $9,736 | Not Implemented |
SU0395 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $103 | $86 | Implemented |
SU0395 # 01 Y:2015 | 01 | 2015 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,070 | $3,930 | Not Implemented |
SU0395 # 04 Y:2015 | 04 | 2015 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $3,740 | $7,476 | Implemented |
SU0395 # 05 Y:2015 | 05 | 2015 | INSTALL OCCUPANCY SENSORS | $66 | $132 | Not Implemented |
BS0063 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $260 | $208 | Implemented |
BS0063 # 02 Y:2015 | 02 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,981 | $3,759 | Not Implemented |
BS0063 # 03 Y:2015 | 03 | 2015 | INSTALL OCCUPANCY SENSORS | $143 | $357 | Implemented |
BS0063 # 04 Y:2015 | 04 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,150 | $1,124 | Implemented |
BS0063 # 05 Y:2015 | 05 | 2015 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $3,476 | $12,265 | Implemented |
BS0063 # 06 Y:2015 | 06 | 2015 | USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR | $2,734 | $2,453 | Not Implemented |
BS0063 # 07 Y:2015 | 07 | 2015 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,883 | $503 | Implemented |
AM0689 # 05 Y:2015 | 05 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,780 | $3,990 | Implemented |
AM0689 # 03 Y:2015 | 03 | 2015 | OPTIMIZE PLANT POWER FACTOR | $8,425 | $12,120 | Not Implemented |
AM0689 # 01 Y:2015 | 01 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $10,100 | $5,270 | Implemented |
AM0689 # 02 Y:2015 | 02 | 2015 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $14,595 | $4,000 | Implemented |
AM0689 # 04 Y:2015 | 04 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,740 | $1,840 | Implemented |