IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 332312 Fabricated Structural Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0402 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,050 $1,980 Implemented
MI0402 # 07 Y:2022 07 2022 USE COMPRESSOR AIR FILTERS $934 $580 Implemented
MI0402 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,776 $580 Not Implemented
MI0402 # 06 Y:2022 06 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,196 $5,530 Not Implemented
MI0402 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,039 $5,244 Implemented
MI0402 # 04 Y:2022 04 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,047 $2,100 Implemented
MI0402 # 03 Y:2022 03 2022 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,485 $12,386 Not Implemented
MI0240 # 01 Y:2013 01 2013 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $15,757 $91,089 Implemented
MI0240 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $544 $208 Implemented
MI0240 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $1,829 $4,802 Implemented
MI0240 # 06 Y:2013 06 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,605 $80 Not Implemented
MI0240 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,769 $1,660 Implemented
MI0240 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,935 $3,315 Implemented
MI0240 # 02 Y:2013 02 2013 INSTALL OCCUPANCY SENSORS $2,089 $4,173 Implemented
MI0238 # 01 Y:2013 01 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $33,139 $21,580 Implemented
MI0238 # 02 Y:2013 02 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $11,581 $2,980 Implemented
MI0238 # 03 Y:2013 03 2013 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $10,510 $12,640 Not Implemented
MI0238 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,487 $160 Implemented
MI0238 # 05 Y:2013 05 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,459 $1,660 Implemented
MI0238 # 06 Y:2013 06 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,663 $560 Not Implemented
MI0238 # 07 Y:2013 07 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $5,216 $2,600 Implemented
MI0238 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,961 $80 Not Implemented
MI0238 # 09 Y:2013 09 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,605 $5,740 Implemented
MI0238 # 10 Y:2013 10 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $224 $430 Not Implemented
MI0197 # 07 Y:2010 07 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $4,983 $2,040 Implemented