IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
NAICS 332312 Fabricated Structural Metal Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0691 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $2,000 Implemented
AM0691 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,250 $1,720 Not Implemented
AM0691 # 04 Y:2015 04 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $440 $0 Implemented
AM0691 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $420 $240 Not Implemented
AM0691 # 06 Y:2015 06 2015 USE PHOTOCELL CONTROLS $280 $130 Implemented
AM0691 # 07 Y:2015 07 2015 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $120 $130 Not Implemented
AM0691 # 01 Y:2015 01 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $25,140 $39,720 Not Implemented
SU0395 # 06 Y:2015 06 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,804 $9,736 Not Implemented
SU0395 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $66 $132 Not Implemented
SU0395 # 02 Y:2015 02 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $103 $86 Implemented
SU0395 # 03 Y:2015 03 2015 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,174 $1,020 Implemented
SU0395 # 04 Y:2015 04 2015 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $3,740 $7,476 Implemented
SU0395 # 01 Y:2015 01 2015 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,070 $3,930 Not Implemented
BS0063 # 07 Y:2015 07 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,883 $503 Implemented
BS0063 # 06 Y:2015 06 2015 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $2,734 $2,453 Not Implemented
BS0063 # 05 Y:2015 05 2015 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $3,476 $12,265 Implemented
BS0063 # 04 Y:2015 04 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,150 $1,124 Implemented
BS0063 # 03 Y:2015 03 2015 INSTALL OCCUPANCY SENSORS $143 $357 Implemented
BS0063 # 02 Y:2015 02 2015 RECOVER WASTE HEAT FROM EQUIPMENT $7,981 $3,759 Not Implemented
BS0063 # 01 Y:2015 01 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $260 $208 Implemented
SD0515 # 01 Y:2015 01 2015 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $209,960 $1,040,000 Not Implemented
SD0515 # 02 Y:2015 02 2015 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $163,675 $32,788 Not Implemented
SD0515 # 03 Y:2015 03 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $49,380 $151,600 Not Implemented
SD0515 # 04 Y:2015 04 2015 UPGRADE OBSOLETE EQUIPMENT $9,105 $25,000 Not Implemented
SD0515 # 05 Y:2015 05 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $5,959 $12,000 Not Implemented