IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

20

matching recommendations
Reset
NAICS 332313 Plate Work Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0935 # 01 Y:2016 01 2016 INSTALL SET-BACK TIMERS $7,525 $5,775 Not Implemented
OK0935 # 10 Y:2016 10 2016 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,167 $1,000 Not Implemented
OK0935 # 09 Y:2016 09 2016 COVER OPEN TANKS $8,035 $1,510 Not Implemented
OK0935 # 08 Y:2016 08 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,682 $1,170 Not Implemented
OK0935 # 07 Y:2016 07 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,782 $17,000 Not Implemented
OK0935 # 06 Y:2016 06 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,536 $51,920 Not Implemented
OK0935 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $765 $3,682 Not Implemented
OK0935 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,207 $5,310 Not Implemented
OK0935 # 03 Y:2016 03 2016 RECOVER WASTE HEAT FROM EQUIPMENT $4,052 $1,913 Not Implemented
OK0935 # 02 Y:2016 02 2016 KEEP EQUIPMENT CLEAN $4,837 $750 Not Implemented
OK0761 # 05 Y:2008 05 2008 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $5,200 $0 Implemented
OK0761 # 04 Y:2008 04 2008 INSTALL SET-BACK TIMERS $3,105 $1,908 Implemented
OK0761 # 03 Y:2008 03 2008 INSTALL OCCUPANCY SENSORS $525 $2,871 Implemented
OK0761 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $14,263 $4,638 Implemented
OK0761 # 01 Y:2008 01 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,213 $0 Implemented
OK0744 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,427 $8,720 Not Implemented
OK0744 # 05 Y:2007 05 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $800 $0 Not Implemented
OK0744 # 04 Y:2007 04 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,247 $2,398 Not Implemented
OK0744 # 03 Y:2007 03 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,080 $360 Not Implemented
OK0744 # 02 Y:2007 02 2007 USE RADIANT HEATER FOR SPOT HEATING $34,603 $3,729 Not Implemented